Types of cross-drainge structures, Civil Engineering

Assignment Help:

Types of Cross-drainage Structures:

The following are the types of cross-drainage structures :

(a) Culverts, having waterway upto 6 m.

(b) Minor Bridges, having waterway in the range of 6-30 m.

(c) Medium size Bridges, having waterway in the range of 30-100 m.

(d) Major Bridges, having waterway greater than 100 m.

(e) Paved dips and Causeway which allow water to flow over the roadway.


Related Discussions:- Types of cross-drainge structures

Define lateral load - actions in pot bearings, Define Lateral Load - Action...

Define Lateral Load - Actions in POT Bearings? Lateral load is transferred from the piston to the POT by contact between the rim of the piston and the wall of the POT. The cont

Classification of bricks based on their quality, Classification of Bricks B...

Classification of Bricks Based on their Quality The bricks used in construction are classified as following: First class bricks Second class bricks Third class bric

Illustrate the design discharge for foundation, Q. Illustrate the Design di...

Q. Illustrate the Design discharge for foundation? To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood d

Define the void ratio and specific gravity of particles, Derive the formula...

Derive the formula among soil moisture content (w), degree of saturation (S), specific gravity (G), and void ratio (e). Saturated clay has a water content of 40% and bulk specif

Stair, Difinaction of stair

Difinaction of stair

Explain a critical path - construction management, Explain a Critical Path ...

Explain a Critical Path The series of activities which determines the earliest possible date of project completion Usually defined as those activities with minimal or

State the ground water levels, Ground Water Levels The location of the...

Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site

Plane table surveing, in plane table surveying which activity is done first...

in plane table surveying which activity is done first whether centering or levelling?

Sinle flumesh bound.., ADVANTAGES AND DISADVANTAGES OF SINGLE FLUMESH BO...

ADVANTAGES AND DISADVANTAGES OF SINGLE FLUMESH BOUND

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd