Types of buildings required for plant, Mechanical Engineering

Assignment Help:

Q. Types of buildings required for Plant?

The following types of buildings may be required:

• Control rooms / Motor Control Centers (MCC) / Equipment rooms.

• Electrical substations.

• Fire fighting pump houses.

• Analysis houses & Laboratories.

• Administration buildings, Warehouses & Maintenance buildings.

• Process Buildings.

Control rooms, substations and instrument houses should be located in a safe area with minimum cable runs to and from the plant units. Recognition should be given to where the main power enters the plant and to heavy electrical power users such as compressors or aerial coolers. MCC / substations are often elevated for ease of cable routing in and out of the building.

In process buildings, process requirements need to be consulted with Civil, Structural, Architectural and HVAC departments.


Related Discussions:- Types of buildings required for plant

Air conditioning systems., an air conditioning system is to take place in a...

an air conditioning system is to take place in an outdoor air at 10 degrees celcius and 30% 0f relative humidity at a steady rate of 45 m^3/min and to condition it to 25 degrees ce

Welding arc physics, WELDING ARC PHYSICS Electric arc as an intense sourc...

WELDING ARC PHYSICS Electric arc as an intense source of heat is employed in welding of materials. In the field of welding techniques, arc welding processes constitute a major po

Drainage of the railway track - construction of railway line, Drainage of t...

Drainage of the Railway Track: It is necessary to keep the embankment free from water. This is done by providing side ditches, all along the edge of the embankment, and leadi

Total tension in cable of the elevator, Total tension in cable of the eleva...

Total tension in cable of the elevator: An elevator having weight 5000N is ascending with an acceleration of 3m/sec 2 . During this ascent its operator which is having weig

Estimate future capacity requirements, Estimate Future Capacity Requirement...

Estimate Future Capacity Requirements: An electronic packaging centre operates 250 days per year, with one eight hour shift. Management believes that a capacity cushion of 15

Pp, matle cutting

matle cutting

Heat faster steel copper or brass, Which conducts heat faster steel copper ...

Which conducts heat faster steel copper or brass? Ans) Copper conducts heat faster than steel or brass. Any material that is good for conducting heat is also good for electricit

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd