Two-Phase flow In a Horizontal Pipe
While working for an oil company you are asked to produce a report on a two-phase flow problem. A mixture of oil and gas is to be pumped along a 100km long pipe from one distribution point to another. Your brief states that the nominal maximum pressure allowable in the pipe is 80bar and if the pressure falls below 40bar then a pumping station will be required to re-pressurise the supply back to 80bar. The flow information at the start of the pipe for the application is as follows:
Gas Oil
Pressure (Bar) 80.0 80.0
Temperature (K) 280 280
Density (kg/m3) 80.0 900.0
Kinematic Viscosity (m2/s) 8.3x10-6 5x10-4
Maximum Volumetric Flowrate (m3/s) 0.23 0.2
Minimum Volumetric Flowrate (m3/s) 0.1 0.1
In your report you should state what diameter of pipe you wish to use, how many pumping stations may be required and discuss the various engineering considerations that must be taken into account. At least one typical calculation is required and if possible predict the type of flow that will occur in the pipe.
State, and justify, any assumptions that you make.
The Specifications for use on a project will be as defined in the ‘Project Execution Plan'. The specification requirements will be clarified in the Engineering Estimate or at the
assignment
difference between geometric and amnufacturing tolerances
A hot gas at 300°C flows through a long metal pipe 100mm outer diameter and 3mm thick. From the standpoint of safety and energy conservation, mineral wool insulation of thermal con
Rutile Electrode This type has thicker coating than cellulosic coated and the flux is mainly composed of rutile (titanium di - oxide) and silicates, with a negligible amount of c
A single jet pelton wheel runs at 300 rpm under a head of 510 m. the jet diameter is 200m, its deflection inside the bucket is 165 o and its relative velocity is reduced by 15% be
advantages and disadvantages of locomotive boilers
Q. Flange Assembly with Bolt Tensioning? Measure the free length of the bolts ultrasonically. This must be done prior to applying any load to the bolt. Install bolts on the
Q. What do you mean by Shell and Tube Exchangers? Shell and tube exchanger piping shall be arranged to provide clearance overhead at both bonnet and channel ends. Piping shall
Determine magnitude of the couple: A square block having each side 1.5 m is acted upon by system of forces along its sides as shown in the adjoining figure. If system reduces
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd