Two-phase flow in a horizontal pipe, Mechanical Engineering

Assignment Help:

Two-Phase flow In a Horizontal Pipe

While working for an oil company you are asked to produce a report on a two-phase flow problem. A mixture of oil and gas is to be pumped along a 100km long pipe from one distribution point to another. Your brief states that the nominal maximum pressure allowable in the pipe is 80bar and if the pressure falls below 40bar then a pumping station will be required to re-pressurise the supply back to 80bar. The flow information at the start of the pipe for the application is as follows:

                                                                                    Gas                 Oil

Pressure (Bar)                                                              80.0                80.0

Temperature (K)                                                            280                 280

Density (kg/m3)                                                            80.0                900.0

Kinematic Viscosity (m2/s)                                          8.3x10-6             5x10-4

Maximum Volumetric Flowrate (m3/s)                             0.23                0.2

Minimum  Volumetric Flowrate (m3/s)                            0.1                   0.1

In your report you should state what diameter of pipe you wish to use, how many pumping stations may be required and discuss the various engineering considerations that must be taken into account. At least one typical calculation is required and if possible predict the type of flow that will occur in the pipe.

State, and justify, any assumptions that you make.


Related Discussions:- Two-phase flow in a horizontal pipe

Define the binary vapour cycle, Write brief notes on the following : (a)...

Write brief notes on the following : (a) Draught System (b) Binary Vapour Cycle (c) Cooling Towers (d) Governing of steam turbines

Evaluate force by replacing equivalent force, Evaluate force by replacing e...

Evaluate force by replacing equivalent force: In designing lifting hook, the forces acting on horizontal section through B can be determined by replacing F by equivale

Pyrolysis-manufacturing methods of ceramics, Pyrolysis Pyrolysis is th...

Pyrolysis Pyrolysis is the procedure of depositing a ceramic on a heated substrate. The process is used to deposit coating or generate thin walled components of graphite or si

Actual vapour compression cycle, diffrence between actual and idealactual v...

diffrence between actual and idealactual vapour compression cycle

Spot welding of different metals-stainless steel, Spot welding of different...

Spot welding of different metals-Stainless steel Stainless steel is having lower thermal conductivity compared to mild steel. Therefore, it requires less heat input. But, stain

Find the time domain equivalent sinusoid, Given these sinusoids: x1(t) = 0....

Given these sinusoids: x1(t) = 0.5cos(25t+20 o ),   x2(t)=0.85cos(25t+160 o ) and   x3(t)= 0.81cos(25t-145 o ) (a) Subplot the phasors X1, X2 and X3 corresponding to the thee si

Determine equivalent maximum shear stress in spring, Determine equivalent m...

Determine equivalent maximum shear stress in spring: A close coiled helical spring contains a stiffness of 10 N/mm. Its length while fully compressed, with adjacent coils touc

Illustrate cetane and octane rating of the fuels, (a) Illustrate cetane and...

(a) Illustrate cetane and octane rating of the fuels (b) Compare two adn four stroke cycle engines.

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd