Turn off time - thyristor, Electrical Engineering

Assignment Help:

Turn off Time

This is also known  as gate controlled  turn on  time. The time  interval between  a specified  point at the beginning  of the  gate pulse  and the  instant when  the device  voltage  has dropped  to a specified low value  during  the switching  of an SCR from the  off state  to the on  state  by a gate pulse.

 


Related Discussions:- Turn off time - thyristor

Describe two ways of correcting the blur, Q. We have discussed three differ...

Q. We have discussed three different color spaces: RGB, HSI and CMY(K). Specify the need for multiple color spaces. Why can we not use only one? Q. A telescope in an observatory

Characteristics of stepper motors - stepper motor , Characteristics of Ste...

Characteristics of Stepper Motors The main  characteristic of stepper  motors is torque  versus stepping or  pulse  rate. It give the  variation  of torque as a function of pu

Transformer of distribution, Transformer of distribution: Let be the t...

Transformer of distribution: Let be the transformer of distribution of the Face(Figure) 3 connected to the primary between phase a and c of a three-phase network of 23 kV. Bot

Power electronics, principle of 120 degree mode of operation of voltage sou...

principle of 120 degree mode of operation of voltage source intverter

Explain steady-state stability, Q. Explain Steady-State Stability? The ...

Q. Explain Steady-State Stability? The property of a power system that ensures that it will remain in equilibrium under both normal and abnormal conditions is known as power-sy

Back to back test of tranformer, what is the advantage and disadvantage of ...

what is the advantage and disadvantage of back to back test of transformer

Electrical machine, what happens when we apply DC supply to transformer pri...

what happens when we apply DC supply to transformer primary

Embedded systems design, You have been requested by your Senior Engineer to...

You have been requested by your Senior Engineer to design a lift control unit (LCU) and prepare a report detailing your proposed solution. The client requires a microcontroller bas

Economic analysis of hydropower, find the net value of power if an average ...

find the net value of power if an average value of energy is assumed to be $0.05/KWh, the capacity value is $30/kw-yr ...

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd