Treatment plant - sewer construction:

Problem:

How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant?

Solution

An amount of solids processed from the basic sedimentation tanks equals the variance in suspended solids concentrations measured across the sedimentation tanks multiplied by the plant flow rate. Thus,

33.75 × 106 l/day (200 mg SS/l - 100 mg SS/l) × kg/1,000,000 mg = 3375 kg primary solids per day.

We are not provided with the concentration difference of suspended solids across the secondary sedimentation tanks so we can determine the amount of secondary solids produced daily in the same manner that we used for primary solids. Therefore, careful examination of the expression of solids retention time displays in which the term Qw Xw could be estimated as the following:

4 days = V =X/Qw×Xw = 5,000,000 l (4,300 mg SS/l)/Qw × Xw

Solve for Qw Xw which equals 5375 kg or say 5400 kg secondary dry solids per day.


Related Discussions:- Treatment plant - sewer construction

What is ceramic mosaic and chequered cement tiles, Q. What is Ceramic mosai...

Q. What is Ceramic mosaic and Chequered Cement tiles? Chequered Mosaic tiles - Repairs to steps of F O Bs should be done only with Chequered Mosaic tiles. Ceramic m

Complete embedment of pipelines into thrust blocks, Q. Complete embedment o...

Q. Complete embedment of pipelines into thrust blocks For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surfac

Distomat, write the brief description about distomat

write the brief description about distomat

Determine the nature of the soil, Determine the nature of the soil A gl...

Determine the nature of the soil A glass cylinder 5 cm internal diameter and with a screen at the bottom was used as a falling head permeameter. The thickness of the sample was

Concrete pavement, Question In case of concrete pavement, why is requir...

Question In case of concrete pavement, why is requirement of 95% by mass of quartz grains are specified in contract? Answer In universal Specification of Civil Enginee

Strength of Materials, How can I get theratio of the maximum deflections of...

How can I get theratio of the maximum deflections of a beam simply supported at its ends with an isolated central load and that of with a uniformly distributed load over its entire

Assignment, The obstacles that the students of civil engineering face when ...

The obstacles that the students of civil engineering face when it comes to produce a good piece of writing in English

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd