Transit Sheds and Warehouses:
These are sheds constructed as steel frames or RCC frames with a steel truss, with galvanised iron or asbestos cement sheets. Transit sheds may be single or two storied. They are constructed about 8-25 m away from the dock wall to house a rail track, roads, and gantry cranes.
Warehouses are constructed at a distance of 10-25 m away from the transit sheds.
The whole area between the dock wall and the transit shed, and between the transit shed and warehouse is paved. A cement concrete pavement or concrete block pavement is long-lasting and maintenance-free.
Good lighting and fire lighting arrangements are needed inside transit sheds and warehouses.
Figure gives the layout of a transit shed and warehouse.
Figure: Transit Shed and Warehouse Location
Q. What is the minimum prescribed track structure for LWR / CWR on Broad Gauge? Ans.- 1. General - The minimum length of LWR depends upon - i. Range of temporary variati
maintenance of wbm roadstion
this is our final year project .please help me to guide about it
find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''
Question Designing of access ramps for drainage channels, why must direction of access ramps is sloping down on the way to downstream ? Answer In designing of access
System A system (often called a closed system) is any collectionof matter within a prescribed boundary, but no matter may enter or leave the system. Note 1. That the bo
types of doors with there prices
Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion
Absolute pressure is measured from a vacuum (0 PSI) and atmospheric pressure is14.7PSIa or 14.7 PSI above a vacuum 1PSI on a tire pressure gauge is known as 1PSIg = 15.7PSIa 10PSIg
Purpose of embedding puddle flange inside the walls of closed valve chambers When valves are closed to stop water flow in a pipeline, a thrust is produced along the direction o
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd