Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd3 of fill. The borrow soil has an in-situ dry density of 94-PCF and a laboratory maximum dry density of 122.5-PCF. The total volume of soil that must be excavated from the borrow area is most nearly:
Solution: The most common method of assessing the quality of field compaction is to calculate the Relative Compaction (RC) of the fill, defined as:
RC = 100 * (field dry density, PCF) / Laboratory maximum dry density (PCF)
Apply the equation using the given data:
RC = 100 x 94-PCF / 122.5-PCF = 76.73%
Calculate the required volume of soil that must be excavated from the borrow area:
(Required Fill) x (Compaction %) x (Relative Compaction)-1 = Excavated Volume (borrow)
10,000-yd3 of fill x (95%) x (76.73%)-1 = 12,380-yd3
Q. Axial flow pumps for large flows and low heads? It is well known that axial flow pumps are the most suitable for providing large flows and low heads. Reason behind this is c
On-line storage vs. off-line storage Design of storage pond is commonly divided into off -line storage and on-line storage. The on-line storage concept includes inclusion of s
What is civil engineering?
Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e
Determine the condition of each activity in the network flow diagram shown below Ans: a. Activity C can be started only after the completion of activities A and
soil sample investigation
Define in biref about the Final Prestress The stress which exists after all losses of prestress have occurred substantially is known as final prestress. This may be calculated
What is WBM road. How it is constructed?
what is this process?whats its procedure?need some case studies
Solved examples on linear programming partB
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd