Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd3 of fill.  The borrow soil has an in-situ dry density of 94-PCF and a laboratory maximum dry density of 122.5-PCF.  The total volume of soil that must be excavated from the borrow area is most nearly:

Solution: The most common method of assessing the quality of field compaction is to calculate the Relative Compaction (RC) of the fill, defined as:

RC = 100 * (field dry density, PCF) / Laboratory maximum dry density (PCF)

Apply the equation using the given data:   

RC = 100 x 94-PCF / 122.5-PCF = 76.73%

Calculate the required volume of soil that must be excavated from the borrow area:  

(Required Fill) x (Compaction %) x (Relative Compaction)-1 = Excavated   Volume (borrow)

 10,000-yd3 of fill x (95%) x (76.73%)-1 = 12,380-yd3

 


Related Discussions:- Total volume of soil that excavated from the borrow area

Zeroth law of thermodynamics, Two systems which are equal in temperature to...

Two systems which are equal in temperature to a third system are equal in temperature to each other

What is critical steel ratio, Q. What is Critical steel ratio? Critica...

Q. What is Critical steel ratio? Critical steel ratio - only consider 250mm of concrete from outer face The purpose of critical steel ratio is to control cracking pattern

Shear force and bending moment, how to draw load intensity and bending mome...

how to draw load intensity and bending moment diagram form a given shear force diagram

Necessity of pile tip cover for rock-socketed H-piles, Q. Necessity of pile...

Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o

Determine difference between stations in feet and in station, The survey ha...

The survey has identified the beginning and ending points along an urban arterial highway that require new sidewalks. The first station is located at 5+88 and the second station is

Purpose of using capping layers in pavement construction, Q. Purpose of usi...

Q. Purpose of using capping layers in pavement construction? When California Bearing Ratio of subgrade is checked to be below a specific percentage (for example 5%), a capping

Unsealed contraction joints in concrete pavement, Unsealed contraction join...

Unsealed contraction joints in concrete pavement For unreinforced concrete pavement, contraction joint is an approximately 3mm wide groove with a depth of about one-third to o

Concrete, if the slump of concrete drops how to rectify

if the slump of concrete drops how to rectify

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd