Total volume of soil that excavated from the borrow area, Civil Engineering

Assignment Help:

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd3 of fill.  The borrow soil has an in-situ dry density of 94-PCF and a laboratory maximum dry density of 122.5-PCF.  The total volume of soil that must be excavated from the borrow area is most nearly:

Solution: The most common method of assessing the quality of field compaction is to calculate the Relative Compaction (RC) of the fill, defined as:

RC = 100 * (field dry density, PCF) / Laboratory maximum dry density (PCF)

Apply the equation using the given data:   

RC = 100 x 94-PCF / 122.5-PCF = 76.73%

Calculate the required volume of soil that must be excavated from the borrow area:  

(Required Fill) x (Compaction %) x (Relative Compaction)-1 = Excavated   Volume (borrow)

 10,000-yd3 of fill x (95%) x (76.73%)-1 = 12,380-yd3

 


Related Discussions:- Total volume of soil that excavated from the borrow area

Shear force and bending moment, relation between shear force and bending mo...

relation between shear force and bending moment and examples based on those relationship

Continuous beam reaction by equilibrium equation, Solve problem of continu...

Solve problem of continuous beam with equilibrium equation

SURVEYING, TYPES OF OBSTACLES IN CHAIN SURVEYING

TYPES OF OBSTACLES IN CHAIN SURVEYING

Disparity between fasteners, Question What is major disparity between ...

Question What is major disparity between fasteners , bolts and screws ? Answer Fastener is a broad term to explain something that is used as a restraint for holding

Modes of transport, Modes of Transport Various Modes of Transport ...

Modes of Transport Various Modes of Transport There are several modes of transport which can be developed by a country. In every country, the principal modes exist ar

Estimation of discharge, Estimation of Discharge: The estimation of d...

Estimation of Discharge: The estimation of discharge of a stream is necessary for determining the waterway, clearance and foundation details. Discharge is estimated from :

Traditional marine piling system of steel tubular pile, Question What i...

Question What is problem in traditional marine piling system of steel tubular pile with concrete infill and what are key possible remedial measures? Answer In design

Offset, what is the meaning of offset

what is the meaning of offset

Determine stability of the upstream slope of an earth dam, Stability of the...

Stability of the upstream slope of an earth dam Give the step by step procedure for examining the stability of the upstream slope of an earth dam by the Swedish method of slice

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd