Engineering Science, Civil Engineering

Assignment Help:
1(a)Explain the difference between a concurrent and a non concurrent force system .
(b)If a non coplanar force system is acted upon by equal and opposite forces,it must be in equilibrium.State this startement is true or false giving a reason for your answer.

Related Discussions:- Engineering Science

Explain the contracted rectangular weir, Explain the Contracted Rectangular...

Explain the Contracted Rectangular Weir Weir plate has sides which extend above the maximum water surface, directing the flow through an opening (b = weir length). Typically th

Pattern of load distribution of piles in such agreement, Question For a...

Question For a rigid pile cap with vertical piles at middle and raking piles at the sides, what is pattern of load distribution of piles in such agreement? Answer Becau

Define the both inside clearance and outside clearance, The inner diameters...

The inner diameters of a sampling tube and that of a cutting edge are 70 mm and 68 mm correspondingly, their outer diameters are 72 and 74 mm respectively. Verify the inside cle

Lock entrance - docks, Lock Entrance: Wet docks have lock entrances to...

Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha

Graphics, 1. Draw the projections of a line AB that is 50 mm long and is pa...

1. Draw the projections of a line AB that is 50 mm long and is parallel to both the HP and the VP. The line is 40 mm above the HP and 25 mm in front of the VP. 2. A line AB, 50 mm

Brick pavement, Brick Pavement: In regions where stone aggregates are...

Brick Pavement: In regions where stone aggregates are not available within economical leads, bricks provide a cheaper alternative. Flat-brick or brick-on-edge pavements provi

Theory of elasticity and plasticity, derivation for strain energy stored in...

derivation for strain energy stored in a body due to torsion

Topographical survey and preparation of drawings, Topographical Survey and ...

Topographical Survey and Preparation of Drawings: Topographical Survey for a road project consists of three sequential stages: (a) Reconnaissance Survey, including a study

Surveying, with a neat well labelled sketch, explain reciprocal ranging.

with a neat well labelled sketch, explain reciprocal ranging.

Concepts and definitions of thermodynamics, System A system (often cal...

System A system (often called a closed system) is any collectionof matter within a prescribed boundary, but no matter may enter or leave the system.  Note 1. That the bo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd