Maintenance of Gravel Roads: The maintenance consists of : filling up of potholes/depressions with fresh gravel and compacting after light sprinkling with water. g
why is weight of raft not considered in structural design of raft and beam
Define Equipments and tools required for under water Inspection of Bridge? Since the underwater inspection of stone masonry substructures involve only a cursory inspection of t
Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by
Q. Write short note on Open Foundation? Broadly the foundation are classified into open i.e. shallow & deep foundations open as stated are shallow foundation where the soil str
with a neat well labelled, explain reciprocal ranging in surveying.
Types of Surveys and Investigations: For preparing a good road project, the following surveys and investigations are needed: (a) Traffic Surveys (b) Topogr
Prime Coat: A prime coat is the application of a low viscosity binder, usually a bituminous emulsion, to a gravel, WBM or WMM surface, to enable the binder to fill up the voi
Distinguish between uniaxial biaxial and triaxial prestressing
distinguish between retaining wall and breast wall
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd