Two readings ie 1.64m and 0.73m were taken during leveling procedure to define the slope of a centerline of a bridge at points A and B. If distance AB=50 m, find the slope of line AB, expressed as a percentage

Related Discussions:- #titl

Surveying, 3 types of obstacles in chaining detail

3 types of obstacles in chaining detail

Explain energy grade line (egl), Explain Energy Grade Line (EGL) Graph ...

Explain Energy Grade Line (EGL) Graph of the sum of the potential, pressure and kinetic energies along a pipe or open channel. Energies are plotted along the y-axis above a dat

Centroid, how tofind centroid of cercular arc

how tofind centroid of cercular arc

Explain fluid mechanics or properties – viscosity, Explain Fluid Mechanics ...

Explain Fluid Mechanics or Properties – Viscosity A measure of a fluid's resistance to flow when acted upon by an external force such as pressure or gravity. Also termed, "Abso

Rubber dams – air-filled vs water-filled, Most of the existing rubber dams ...

Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i)  By giving same sheet length and dam height, tensi

Compute the negative skin friction of the pile group, A square pile group o...

A square pile group of 9 piles passes by a recently filled up material of 4.5 m depth. The diameter of the pile is 30 cm and pile spacing is 90 cm centre to centre. If the unconfin

Verify the total active thrust on the wall per lineal metre, A smooth backe...

A smooth backed vertical wall is 6.3 m high and retains a soil with a bulk unit weight of 18 kN/m 3 and φ = 18°. The top of the soil is level with the top of the wall and is horiz

Define the alternate depths - hydrologic system, Define the Alternate Depth...

Define the Alternate Depths In open channels, two alternate depths of flow have the same energy for the same flow rate. As shown in the figure, the hyperbolic plot of energy (x

Maintenance of drainage and shoulders, Maintenance of Drainage: Maint...

Maintenance of Drainage: Maintenance of drainage will ensure that the run-off is taken away from the runway efficiently. The side ditches and buried pipes should be cleaned r

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd