Time to remove formwork to cater for early thermal movement, Civil Engineering

Assignment Help:

Q. Time to remove formwork to cater for early thermal movement?

Let's take a circular column as an illustration to explain effect of internal restraint to thick sections. 

When temperature is increasing, temperature in the core is higher than outer zone. The inner core would have a higher expansion and exert pressure to the outside. Induced compressive stress will yield the formation of radial cracks near the surface of concrete.

When temperature drops, concrete at outside drops to surrounding temperature whereas the concrete at central region continues to cool down. Contraction associated with inner concrete persuades tensile strains and forms cracks tangential to circular radius. 

It is advantageous for thick sections (say >500mm) to have late removal of formwork to decrease early thermal cracking. This is to enable more time for the centre of concrete section to cool down progressively to decrease the risk of thermal cracking. It is effective in controlling thetemperature differential across the cross section of concrete structures and decreasing the potential of internal cracking because of early thermal movement.


Related Discussions:- Time to remove formwork to cater for early thermal movement

Determine the term - final tension, Determine the term - Final Tension ...

Determine the term - Final Tension The tension in tendons after losses of prestress have taken place is called as final tension. Final tension is taken to be corresponding  to

#title., desirable properties in green concrete

desirable properties in green concrete

Transition curves - geometric design of roads, Transition Curves: If ...

Transition Curves: If a vehicle travelling on a straight enters a horizontal curve abruptly, it will cause shock and sway. To avoid this, it is customary to provide a transit

Soil compaction, Soil Compaction: Soils used in road construction nee...

Soil Compaction: Soils used in road construction need to be thoroughly rolled and compacted. Compaction of soil is needed for the following reasons. (a) A well compacted s

Define abrasion of steel structures - inspection of bridge, Define Abrasion...

Define Abrasion of steel structures? Abrasion of steel structures can generally be recognised by a worn, smooth, polished appearance of the surface.  Abrasion is caused by cont

Explain tension and compression anchorage length, Q. Explain Tension and co...

Q. Explain Tension and compression anchorage length? Tension anchorage length vs. compression anchorage length Tension anchorage length of steel reinforcement in concrete

Find out load carrying capacity, Q.for ISMB200 having 6.70 m span simply su...

Q.for ISMB200 having 6.70 m span simply supported so find out load carrying capacity.

Analysis of prestress and bending stresses, Normal 0 false fa...

Normal 0 false false false EN-IN X-NONE X-NONE

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd