Q. Time to remove formwork to cater for early thermal movement?

Let's take a circular column as an illustration to explain effect of internal restraint to thick sections. 

When temperature is increasing, temperature in the core is higher than outer zone. The inner core would have a higher expansion and exert pressure to the outside. Induced compressive stress will yield the formation of radial cracks near the surface of concrete.

When temperature drops, concrete at outside drops to surrounding temperature whereas the concrete at central region continues to cool down. Contraction associated with inner concrete persuades tensile strains and forms cracks tangential to circular radius. 

It is advantageous for thick sections (say >500mm) to have late removal of formwork to decrease early thermal cracking. This is to enable more time for the centre of concrete section to cool down progressively to decrease the risk of thermal cracking. It is effective in controlling thetemperature differential across the cross section of concrete structures and decreasing the potential of internal cracking because of early thermal movement.


Related Discussions:- Time to remove formwork to cater for early thermal movement

Overhanging beams, Do we take the whole length (including the over hanging ...

Do we take the whole length (including the over hanging portion when we say the "whole span" of th beam ?

Problems in turbid water - underwater inspection of bridge, Define Problems...

Define Problems in turbid water - underwater inspection of bridge? There are three main problems, which limit the viewing performance of an underwater camera. These are: -

Determine the density index of the sand sample, An undisturbed sample of sa...

An undisturbed sample of sand has a dry weight of 18.9 N and a volume of 1143 cm 3 . The solids have a specific gravity of 2.72. Laboratory tests indicate void ratios of 0.40 and 0

State the ground water levels, Ground Water Levels The location of the...

Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site

Structural connection loosening - deterioration in steel, Define Structural...

Define Structural connection loosening - Deterioration in Steel? Structural connections joined together by rivets or bolts have a tendency to work loose over an extended period

Explain rcra and hswa - hazardous waste regulations, Explain RCRA and HSWA ...

Explain RCRA and HSWA - Hazardous Waste Regulations 1. In 1976, Congress passed the Resource Conservation and Recovery Act (RCRA) and directed EPA to establish hazardous waste

Effect of footing size on stress zone, Q. Effect of Footing Size on Stress ...

Q. Effect of Footing Size on Stress Zone? The modulus of elasticity of the soil may be determined by plotting stress-strain diagram based on triaxial test or plate load test.

Micro-organism ratio, Micro-organism ratio: Determine the F/M ratio (i...

Micro-organism ratio: Determine the F/M ratio (in units of lbs BOD5/lb MLSS-day) using data provided in the above example problem. Solution By definition, F/M = Q S

Classification of timber, Classification of Timber Several bases are co...

Classification of Timber Several bases are considered for the classification of timbers. The following are the essential basis: Mode of growth Modulus of elasticity

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd