Time and cost analysis, Mechanical Engineering

Assignment Help:

Time and Cost Analysis

This discusses about certain basic activities that must be carried out in a factory to convert raw materials into finished products. These activities broadly are Processing and assembly operations, Material handling, Inspection and testing and Coordination and control.

The machining times for various machining processes and the importance of it is explained.

The machining time in turning (t) is as

t = L + L0 /2 f N

The machining time in milling T in minutes can be calculated as

T = (L × n)/ f Z N minutes

Time for drilling the hole = L/ f N     minutes

Machining Time = Depth of hole to be bored in mm minutes/ N × feed/rev

where, N = No. of revolutions per min. of machine spindle or work.

In boring operation the machining time is calculated the same manner as in turning. It is given by the following relation :

Machining Time = Depth of hole to be bored in mm minutes/ N × feed/rev

where, N = No. of revolutions per min. of machine spindle or work. Machining time for shaping can be calculated as below.

No. of cycles required (n) = Shaping width / Feed per cycle f

= B/f

Machining time = No. of cycles × time required for each cycle

1428_Time and Cost Analysis.png

The machining time (T) in cylindrical grinding can be calculated from the following relationship.

T = (L . P . K )/ ( f . N . t) min .

The total production cost of machined components is made up of the following components : material cost, labour cost, overhead cost, tool cost and cost of percent of the total cost. But the influence of tools on the other costs is considerable. It is often possible that the tool cost is increased but the total production cost is reduced considerably because of the influence of the tool on other aspects of cost.

The costs that go into machining a part can be broken into three categories as Material removal cost, Tool cost and Non-productive cost

Total machining cost = Material removal cost + Tool cost + Non-productive cost. The tool cost is made up of

(a) Tool change cost (TCC) or cost for indexing the insert

(b) Tool regrinding cost (TRC)         

(c)  Tool original cost (TOC)

(d) Tool inventory cost (TIC)

Total tool cost = TCC + TRC + TOC + TIC


Related Discussions:- Time and cost analysis

Determine the response of the system, A force F(t) is suddenly applied to a...

A force F(t) is suddenly applied to a mass m which is supported by a spring with a constant stiffness ‘K'. After a short period of time T, the force is suddenly removed. In the mea

Rich mixture-mixture requirement , Rich Mixture: It generally ranges...

Rich Mixture: It generally ranges from approximately 7 : 1 to 13 : 1 proportion of air to fuel by weight. To get a high power rich mixture is required. In fact to start the e

Principal stress and principal plane, Use the graphics and the equation to ...

Use the graphics and the equation to define the term principal stress and principal planes.

#totto cycleitle.., for an otto cycle, compression ratio=8.5:1,air inlet=15...

for an otto cycle, compression ratio=8.5:1,air inlet=15degree celsius and pressure=101.3kpa, maximum cycle temperature= 1800degree celsius, what is temperature after compression,te

Explain the advantages of automation, Explain the Advantages of Automation ...

Explain the Advantages of Automation 1. There is an increase in productivity. 2. The unit cost is reduced as larger number of components can be manufactured in shorter time

Vectors, Resolving vectors into I j k component

Resolving vectors into I j k component

Relation ship, what is the relation ship between tolrancr grade and manufac...

what is the relation ship between tolrancr grade and manufacturing process ?

Equipment for resistance welding, EQUIPMENT FOR RESISTANCE WELDING The ...

EQUIPMENT FOR RESISTANCE WELDING The equipment for resistance welding is different from that for arc welding for the following reasons: Resistance welding machines are complica

Duty cycle, Duty cycle The concept of duty cycle is to be clearly under...

Duty cycle The concept of duty cycle is to be clearly understood before operating any machine. Unlike the arc welding power sources, the resistance welding power sources are de

Design pumps for plant layout, Q. Design Pumps for plant layout? Pumps ...

Q. Design Pumps for plant layout? Pumps handling flammable or combustible materials are relatively frequent sources of leakage and should therefore be located as far as practic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd