Enumerate about the Bonded Member It is a concrete member in which tendons are bonded to the concrete. They may be directly bonded to the concrete as in the case of pre-tension
Q. What is Chamfering of rail? Chamfering of rail holes has been done for the life of rail hole is increased and chances of the rail hole developing any crack is eliminated.
How do we overcome obstacle like river in chain survey?
Determine the flow velocity in 2,000 ft of 8 inch diameter piping flowing full. The energy lost in piping is 54 ft. Use nominal pipe diameter and C = 140. Solution: Use v =
how can i design reinforcement for a two way slab
Q. Describe Principles of river protection works? Determination of design discharge for a bridge is sometimes required to be based on flood marks left during unprecedented abno
Compute the stresses at top and bottom fibres in a simply supported pre-stressed concrete beam with a rectangular cross section, 200 mm wide and 400 mm deep at sections A-A, B-B an
types mixing,curing,water cement ratio,qualities and workability
Q. Free- fall concrete placement in bored piles? Based on the research by STS Consultants Ltd it was found that concrete placed by free falling below 120 feet will not suffer f
length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd