Question-What are three key types of reinforcement used in pre stressing?
Answer-(i)Spalling reinforcement -
Spalling stresses are established behind loaded area of anchor blocks and this causes breaking away of surface concrete. These stresses are induced by strain incongruity with Poisson's effects, by the shape of stress trajectories. (ii)Equilibrium reinforcement -Equilibrium reinforcement is necessary where there are several anchorages in which pre stressing loads are useful sequentially. (iii)Bursting Reinforcement -Tensile stresses are induced through pre stressing operation and maximum bursting stress occurs where stress trajectories are concave towards a line of action of load. Reinforcement is required to oppose these lateral tensile forces.
A 16-pile group has to be arranged in the form of a square in soft clay with uniform spacing. Neglecting end-bearing, verify the optimum value of the spacing of the piles in terms
Soil pressure enhances with depth due to the overburden or self-weight of the soil and because of loads imposed upon the soil. For example, the pressure variation below the dept
State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces
Q. Replacement of loose rivets? i) Slight slackness of rivet does not cause loss of rivet strength. ii) Renewal of slack rivets should be done only when the slack rivets are
introduction of levelling
State the Needs for high strength steel and concrete In prestressed concrete construction, tendons have 3 small area of cross-section compared to the cross-sectional area
STRUCTYRE IS HAVING BASEMENT JUST WITH THE SIDE OF FOUNDATION WHICH CAUSED SETTLEMENT AND CRACKS IN THE STRUCTURES
A contractor was awarded a Contract to excavate and haul 200,000-yds 3 of silty clay (USCS classification ML) with a bulking factor of 30%. The contractor's fleet of dump trucks
Q. Colebrook White formula suitable for shallow gradient of pipes? Manning's Equation is commonly used for rough turbulent flow while Colebrook-White Equation is adopted for t
Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd