Question-What are three key types of reinforcement used in pre stressing?
Answer-(i)Spalling reinforcement -
Spalling stresses are established behind loaded area of anchor blocks and this causes breaking away of surface concrete. These stresses are induced by strain incongruity with Poisson's effects, by the shape of stress trajectories. (ii)Equilibrium reinforcement -Equilibrium reinforcement is necessary where there are several anchorages in which pre stressing loads are useful sequentially. (iii)Bursting Reinforcement -Tensile stresses are induced through pre stressing operation and maximum bursting stress occurs where stress trajectories are concave towards a line of action of load. Reinforcement is required to oppose these lateral tensile forces.
define Structural Analysis
The internal forces in any cross-section of a symmetric member in pure bending are equivalent toa couple M The moment of the couple is referred to as the bending moment in the s
Q. Internal force of preloaded fasteners? Force in a bolt in a bolted joint relies on the preloading force applied to it at the time of the tightening operation. For example, w
Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd 3 of fill. The borrow soil has an in-situ
Question Explain components of a typical expansion joint? Answer Dowel bar-This is major component of joint. It serves to guide direction of movement of concrete growth. Therefo
types of arches
what are the problems in traditional marine pilling system of steel tubular pile with concrete infill
Explain various forms of tension members.
Why are undisturbed samples needed? Describe any one procedure of obtaining undisturbed samples for a multi-storeyed building project. For what purpose are geophysical methods u
Question Would a sub-base layer be served as a drainage layer to take away water from pavement? Answer As well providing load distribution in post-construction stage a
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd