Question-What are three key types of reinforcement used in pre stressing?
Answer-(i)Spalling reinforcement -
Spalling stresses are established behind loaded area of anchor blocks and this causes breaking away of surface concrete. These stresses are induced by strain incongruity with Poisson's effects, by the shape of stress trajectories. (ii)Equilibrium reinforcement -Equilibrium reinforcement is necessary where there are several anchorages in which pre stressing loads are useful sequentially. (iii)Bursting Reinforcement -Tensile stresses are induced through pre stressing operation and maximum bursting stress occurs where stress trajectories are concave towards a line of action of load. Reinforcement is required to oppose these lateral tensile forces.
Q. What is Switch and Expansion Joint? Switch Expansion, Joint (SEJ) is an expansion joint installed at each end of LWR/CWR to permit expansion/contraction of the adjoining bre
precaution to be taken for roads construction in marshy land
Calculate the ultimate compressive strength A 6 in. by 12 in. cylinder failed at an axial compressive force of 120,000-lbf, at 28 days. Calculate the ultimate compressive stren
The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio
Question While branch pipelines are connected to pipelines, now and then Y-junctions or fitting branched pipelines to key pipelines by formation of holes in pipelines are u
Road Pavements: Pavements constitute an important part of road as they withstand the traffic loads and transmit them to the earthen embankment. A study of the types of pavemen
Determine the thickness of flexible pavement layer 2 given the following: FACTS: Total Structural Number required = 7.0 Total number of layers = 2 Layer 1 consists of
Q. PH Value of Water? It is a symbol for hydrogen ion concentration and indicates acidity or alkalinity. When P H Value more than 7 water is alkaline and less than 7 water is a
Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by
Q. Earth work in high embankments? (a) Borrow pits must not be dug close to telegraph poles, electric poles, level crossings, bridges a culverts, or within 800 meters of the bo
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd