Testing After Install

After installation of a propeller, the engine must be ground run in order to check the propeller for correct function and operation.  Aircraft propeller installations vary considerably, and no set testing procedure would be satisfactory for all aircraft.  It is imperative, therefore, that any particular installation should be tested in accordance with the approved AMM procedure, which will normally include the following general requirements:

  • The engine should normally be fully cowled, and the aircraft should be facing into wind before starting an engine run. It is sometimes recommended that the pitch change cylinder should be primed with oil before starting, by operation of the feathering pump.
  • The safety precautions appropriate to engine ground running should be taken, the controls should be set as required, and the engine should be started.
  • As soon as the engine is operating satisfactorily, and before using high power, the propeller should be exercised in the manner specified in the Maintenance Manual, to establish that the pitch change mechanism is operating.
  • The checks specified in the Maintenance Manual to confirm satisfactory operation of the propeller system, including constant speed operation, feathering, operation of the propeller pitch change throughout its range, synchronisation with other propellers on the aircraft, and operation of associated warning and indicating systems, should be carried out.
  • Engine running time should be kept to a minimum consistent with satisfactory completion of the checks, and a careful watch should be kept on engine temperatures to avoid overheating. With turbine engines, changes to operating conditions should be carried out slowly, to avoid rapid engine temperature changes, and to conserve engine life.
  • When all checks have been successfully carried out, the engine should be stopped, and a thorough inspection of all propeller system components should be carried out, checking for security, chafing of pipes and cables, and signs of oil leaks.
  • Don't forget to complete all paperwork related to the maintenance activity, including Duplicate Inspections.

Note:  If vibration was experienced during the engine run, the hub retaining nut should be re-tightened after the engine shaft has cooled down. 


Related Discussions:- Testing of propellers

Blending or mixing, To achieve successful results in powder metallurgy the ...

To achieve successful results in powder metallurgy the metallic powder must be thoroughly homogenized. The term blending and mixing are both used in this content. Blending refers t

CRO, different types of switches used in CRO

different types of switches used in CRO

Explain derivatives in terms of capital markets, Explain derivatives in ter...

Explain derivatives in terms of capital markets The term mixture indicates that it has no separate value that is its value is entirely resulting from the of the actual resources

Logic gate -xor gate, 'Exclusive or' gate: The basic OR gate illustrate...

'Exclusive or' gate: The basic OR gate illustrated previously in Figure 3 was seen to include the AND operation in that its output will adopt the 1 state not only when either i

Logic gates and gate, Expertsmind.com  brings you unique solution in Elect...

Expertsmind.com  brings you unique solution in Electrical Engineering Logic GATES   Logic gates process one or more input signals in a logical manner. Depending on th

Programming of 18F4550, #include org 0xoo movlw 0x00 ---------- movlw 0xff ...

#include org 0xoo movlw 0x00 ---------- movlw 0xff movwf PORTB end

Software engineering, what is differnce between need and requirement?

what is differnce between need and requirement?

New assembly buildings - fire protection engineering, N e w Assembly Buil...

N e w Assembly Buildings: 12.1.1.1 The requirements of this chapter shall apply to new buildings or portions thereof used as an assembly occupancy. 12.1.3.2 Simultaneous

Credit limit, HOW WOULD YOU JUDGE THE POTENTIAL PROFIT OF BAJAJ ELECTRONICS...

HOW WOULD YOU JUDGE THE POTENTIAL PROFIT OF BAJAJ ELECTRONICS

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd