Techniques and resources

Different techniques and resources were used in different areas of the problem during the course of the project.

The most important of them was the use of simulating package called proteus. The testing of a program and a circuit in physical was a tedious task. So proteus was for testing by simulating the design in it. It is really easier to redraw or modify a circuit and it has all the components required for the circuit construction.

If the circuit was soldered on a veroboard, it would have been time consuming and prone to faults. So the team thought of using the PCB as it was much easier. The circuit designs of the remote and the receiver were printed on a PCB and it helped save a lot of time as the whole circuit was soldered in a matter of minutes.

 


Related Discussions:- Techniques and resources in problem base learning

Electrons, Ask question #Minimum 100 words accepted how does the charge pla...

Ask question #Minimum 100 words accepted how does the charge plate relate to the movement of electrons

Commutation in dc machines, Currents induced in armature conductors of a d....

Currents induced in armature conductors of a d.c. generator are alternating. To make their flow unidirectional in the external circuit, we need a commutator. Moreover, these curren

Critical rate of rise of current - thyristor , Critical Rate of  Rise of ...

Critical Rate of  Rise of Current The maximum  rate of  increase of current  during  on state  which  the SCR  can tolerate is called  the critical rate of rise  of current  f

Give some applications of constantan, Give some applications of constantan....

Give some applications of constantan. Constantan is an alloy of nickel and copper. It is used in thermocouples, motor starters and precision resistors.

Why two rectifier is used in smps, Its not essential that a power plant use...

Its not essential that a power plant uses only two rectifiers, it depends on the load there at the site and the capacity of the rectifier or SMPS. Assume the load at the site is 12

Draw the power triangle for each load, Q. Two balanced, wye-connected, thre...

Q. Two balanced, wye-connected, three-phase loads are in parallel across a balanced, three - phase 60- Hz, 208-Vsupply. The first load takes 12 kWat 0.6 power factor lagging, and t

Determine the power rating of compressor motor, An ice plant produces 12ton...

An ice plant produces 12tonn of ice per day at 0 0 C using water at 300C. The plant operates on reversed Carnot cycle between -15 0 C and 28 0 C. If the actual C.O.P. is 50% of the

Explain common emitter configuration, Q. Explain Common emitter configurati...

Q. Explain Common emitter configuration? Common emitter configuration: In this circuit the emitter is common to both input and the output.Such a configuration is also known as

Daa decimal adjust accumulator instruction , DAA Decimal Adjust Accumulator...

DAA Decimal Adjust Accumulator Instruction This  instruction adjusts the contents  of the accumulator  into BDC (Binary Coded Decimal )  form  after a BCD  addition. It should

Pneumatics, 3. Design and draw a circuit using the cascade system to operat...

3. Design and draw a circuit using the cascade system to operate two cylinders (A and B) which, on the operation of a start valve, produces the sequence A – B + B – A+. The cylinde

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd