Techniques and resources in problem base learning, Electrical Engineering

Assignment Help:

Techniques and resources

Different techniques and resources were used in different areas of the problem during the course of the project.

The most important of them was the use of simulating package called proteus. The testing of a program and a circuit in physical was a tedious task. So proteus was for testing by simulating the design in it. It is really easier to redraw or modify a circuit and it has all the components required for the circuit construction.

If the circuit was soldered on a veroboard, it would have been time consuming and prone to faults. So the team thought of using the PCB as it was much easier. The circuit designs of the remote and the receiver were printed on a PCB and it helped save a lot of time as the whole circuit was soldered in a matter of minutes.

 


Related Discussions:- Techniques and resources in problem base learning

Transformer, What is the difference between primary and secondary winding o...

What is the difference between primary and secondary winding of transforme

Compute the minimum line current for the motor, A three-phase, wye-connecte...

A three-phase, wye-connected, four-pole, 400- V, 60-Hz, 15-hp synchronous motor has a synchronous reactance of 3  per phase and negligible armature resistance. The data for its no

Operations on vectors, Can add vectors using the parallelogram rule Can ...

Can add vectors using the parallelogram rule Can multiply a vector by a scalar            - result is a parallel vector                        • length is scaled

V-i characteristics - power semiconductor devices , V-I Characteristics ...

V-I Characteristics  In the  normal  mode of  operation of an IGBT  a positive  voltage is applied to the collector relative to emitter. When  the gate is at zero potential wi

Electronic and electrical measurement CRO., Describe the construction and w...

Describe the construction and working of atleast two types of storage CRO

Determine overall power factor of the combined load, Q. Two balanced, three...

Q. Two balanced, three-phase, wye-connected loads are in parallel across a balanced, three-phase supply. Load 1 draws 15 kVA at 0.8 power factor lagging, and load 2 draws 20 kVA at

Integrator circuit, Q. Addition and integration can be combined by the summ...

Q. Addition and integration can be combined by the summing integrator circuit shown in Figure. With the given component values and input waveforms, sketch v o when S is opened at

Calculate the total charge on the integrator, Q. Consider the dual-slope A/...

Q. Consider the dual-slope A/D converter of Figure. (a) Calculate the total charge on the integrator due to the input voltage Vin during the signal integration time T. (b) Ob

Turn off time - thyristor, Turn off Time This is also known  as gate...

Turn off Time This is also known  as gate controlled  turn on  time. The time  interval between  a specified  point at the beginning  of the  gate pulse  and the  instant wh

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd