Techniques and resources in problem base learning, Electrical Engineering

Assignment Help:

Techniques and resources

Different techniques and resources were used in different areas of the problem during the course of the project.

The most important of them was the use of simulating package called proteus. The testing of a program and a circuit in physical was a tedious task. So proteus was for testing by simulating the design in it. It is really easier to redraw or modify a circuit and it has all the components required for the circuit construction.

If the circuit was soldered on a veroboard, it would have been time consuming and prone to faults. So the team thought of using the PCB as it was much easier. The circuit designs of the remote and the receiver were printed on a PCB and it helped save a lot of time as the whole circuit was soldered in a matter of minutes.

 


Related Discussions:- Techniques and resources in problem base learning

Show implementation of synchronous counter using d flip-flop, Q. Consider t...

Q. Consider the synchronous counter shown in Figure of the text. (a) Draw its timing diagram. (b) Show the implementation of the same synchronous counter using D flip-flops.

Power system, a rectangular surge of 2us duration and magnitude of 100Kv tr...

a rectangular surge of 2us duration and magnitude of 100Kv travels along a line of surge impedance 500 ohms. The latter is connected to another line of equal impedance through an i

Difference between write-through and write-back caches, The comparison can ...

The comparison can be made out of two feature 1) Performance and 2) Integrity of Data Write through is better in integrity as it will flush for every writes. Write b

Determine active power-reactive power, Three equal impedances of D ohms res...

Three equal impedances of D ohms resistance and C inductive reactance are connected in a DELTA configuration. The line voltage is A00 volts. Determine the line current, phase cur

Role of bureau of energy efficiency, Role of Bureau of Energy Efficiency ...

Role of Bureau of Energy Efficiency The role of the Bureau of Energy Efficiency is to: Ready standards and labels of appliances and equipment; Develop a list

1-phase full bridge inverter will rl load , 1- Phase Full  Bridge  inver...

1- Phase Full  Bridge  inverter will RL Load For a  resistive load R the load  current  wave form  will be  identical with load  voltage wave form  and feedback  diodes will

Three byte instruction , Three byte instruction The  instruction which...

Three byte instruction The  instruction which  have 16  bit data address  as its  operand  are three byte  instruction. They  need three  memory  locations to store  them in m

State the advantages of expert systems, State the Advantages of expert syst...

State the Advantages of expert systems -  Never "forgets" to ask a question in determining the logic -  provides consistent answers - Less skilled work force needed, ther

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd