Techniques and resources in problem base learning, Electrical Engineering

Assignment Help:

Techniques and resources

Different techniques and resources were used in different areas of the problem during the course of the project.

The most important of them was the use of simulating package called proteus. The testing of a program and a circuit in physical was a tedious task. So proteus was for testing by simulating the design in it. It is really easier to redraw or modify a circuit and it has all the components required for the circuit construction.

If the circuit was soldered on a veroboard, it would have been time consuming and prone to faults. So the team thought of using the PCB as it was much easier. The circuit designs of the remote and the receiver were printed on a PCB and it helped save a lot of time as the whole circuit was soldered in a matter of minutes.

 


Related Discussions:- Techniques and resources in problem base learning

Get bode plots of magnitude and phase of transfer function, Develop a PSpic...

Develop a PSpice program and use PROBE to obtain Bode plots of the magnitude and phase of the transfer function ¯V out / ¯V in for the high-pass ?lter circuit shown in Figure (a)

Digital ttl circuit, Execution of Digital Logic Circuits A safety circ...

Execution of Digital Logic Circuits A safety circuit is employed on a lathe to prevent the motor turning if it is not safe to operate. A series of 2 switches are used to check

Illustrate working of differential amplifier, Q. Illustrate working of Diff...

Q. Illustrate working of Differential Amplifier? Figure shows a weighted differencing amplifier, where "weighted" refers to the fact that the output voltage has the form v o =

Step up chopper - power supplies , Step Up Chopper In this  chopper av...

Step Up Chopper In this  chopper average output  voltage  is greater than  input  voltage. The circuit  different  mode  of operation and  current  waveforms are show. When

Defective metering and meter reading errors, Defective Metering and Meter R...

Defective Metering and Meter Reading Errors Defective Metering Tampered, slow running, stalled, damaged meters are a cause of huge losses to the utility. The electromecha

Querying the gis, Querying the GIS: Interfaces which use the querying...

Querying the GIS: Interfaces which use the querying facility are available with the RDBMS. In the network-mapping environment, these give accurate and reliable information to

SOLID MENSURATION, the base of isosceles triangle and the altitude drawn fr...

the base of isosceles triangle and the altitude drawn from one of the congruent sides are equal to 18cm and 15cm, respectively. Find the lengths of the sides of the triangle.

Find the voltage regulation and efficiency of the line, Q. A60-Hz, three-ph...

Q. A60-Hz, three-phase transmission line has a total per-phase series impedance of 35+j140 .Ifit delivers 40 MW at 220 kV and 0.9 power factor lagging, find: (a) The voltage, c

C programming., #queComputers are frequently used in check-writing systems,...

#queComputers are frequently used in check-writing systems, such as payroll and accounts payable applications. Many stories circulate regarding weekly pay- checks being printed (by

Matlab codes for transportation problem, i need matlab codes for the minimu...

i need matlab codes for the minimum cell cost method to start the initial feasible solution and the stepping stone method to find the optimum value

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd