Techniques and resources

Different techniques and resources were used in different areas of the problem during the course of the project.

The most important of them was the use of simulating package called proteus. The testing of a program and a circuit in physical was a tedious task. So proteus was for testing by simulating the design in it. It is really easier to redraw or modify a circuit and it has all the components required for the circuit construction.

If the circuit was soldered on a veroboard, it would have been time consuming and prone to faults. So the team thought of using the PCB as it was much easier. The circuit designs of the remote and the receiver were printed on a PCB and it helped save a lot of time as the whole circuit was soldered in a matter of minutes.

 


Related Discussions:- Techniques and resources in problem base learning

Find the cutoff frequency, Q. A rigid 50- coaxial transmission line has ai...

Q. A rigid 50- coaxial transmission line has air as dielectric. If the radius of the outer conductor is 1 cm, find the cutoff frequency

What is effect of overheating on an electric insulator, What is the effect ...

What is the effect of overheating on the life of an electric insulator? An insulator is designed to withstand amount of heat. However, when an insulator is overheated so dielec

Find the bandwidth of the modulated signal, The signal m(t), whose frequenc...

The signal m(t), whose frequency spectrum M(f ) is to be transmitted from one station to another. Let the signal be nor- malized, i.e., -1 ≤ m(t) ≤ 1. Find the bandwidth of the mod

Determine the force applied to the plunger by system, Q. For the electromag...

Q. For the electromagnet shown in Figure, the λ-i relationship for the normalworking range is given by i = aλ 2 + bλ(x -d) 2 ,where a and b are constants. Determine the force app

Project, electrical project produse eneargy desingn

electrical project produse eneargy desingn

Calculate the magnitude of fault current, Figure shows an isolated three-ph...

Figure shows an isolated three-phase load supplied from a 33 kV/11 kV substation via a 30 km long three-phase 11 kV overhead line. The overhead line has the following series parame

Calculate expected peak demand for transformer, What is the expected peak d...

What is the expected peak demand for a transformer feeding the following loads?                           Connected                 kVA

What are the different types of patrolling, Q. What are the different types...

Q. What are the different types of Patrolling? When these are adopted? What are points to be considered while preparing the charts? Ans.- Types of Patrolling. 1. Keyman's

Diploma in electrical engineering, After I complete my diploma how I get a ...

After I complete my diploma how I get a job in goverment

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd