Systemic requirements - gis technology, Electrical Engineering

Assignment Help:

Systemic Requirements:

A robust GIS solution for a distribution utility comprises the subsequent:

  • GIS application and database software should be OGC (Open Geospatial Consortium) Compliant,
  • Differential GPS survey of entities and consumers and overlaying on satellite imagery should be on the subsequent scales:

1     Urban/Cities/Metros on 1:1000 scales.

2     Semi urban on 1:2500 scale

3    Rural area on 1:5000 scale (the survey in rural areas might be restricted to the corridor of HT/LT lines survey rather than covering whole rural area).

  • The map resolution should be as follows:

1    Spatial resolution less than or equal to 2.5 metre ground sample distance (GSD) per pixel for urban areas.

2    Spatial resolution less than or equal to 10 metre GSD per pixel for rural areas.

  • Door-to-door survey of customers and collection of data should be carried out.
  • Utility HQ/Circle HQ as Data Centre should be equipped along with servers and networked with Utility HQ, Divisions, Subdivisions, etc.
  • GIS System Testing and Commissioning should be completed for given concurrent users.

The utility must be ready for integrated IT enabling and the essential basic IT hardware and software involving networking must be in place.


Related Discussions:- Systemic requirements - gis technology

Explain in brief the functions of clock generator chip, Explain in brief th...

Explain in brief the functions of the clock generator chip, 8284. 8284 Clock generator: The 8284 is an ancillary element to the microprocessors. Without any clock generato

Expression for generated emf in a dc generator, Q.   Derive the expression ...

Q.   Derive the expression for generated emf in a dc generator. Ans. Expression for Generated emf in a DC Generator                We shall now derive an expre

What do you maen by debugger, What do you maent by Debugger? Debugger:...

What do you maent by Debugger? Debugger: This is a program that allows user to debug and test programs. All computers with microprocessor kits give debugging facility. To not

SUPERPOSITION THEOREM, CONCLUSION IN BRIEF OF SUPERPOSITION IN ASSIGNMENT

CONCLUSION IN BRIEF OF SUPERPOSITION IN ASSIGNMENT

Rfid, i was told that silicone rubber will stop electricity, but i need mor...

i was told that silicone rubber will stop electricity, but i need more info like how thick and any more info you can share

Designing 100 line exchange using uni-selector, Q. Designing 100 line excha...

Q. Designing 100 line exchange using Uni-selector? Here three different designing methods for 100 line exchange are discussed: Design: Strowger switching system is designe

What do you mean by load factor, Q. What do you mean by Load factor? Th...

Q. What do you mean by Load factor? The two components of electric service are demand and energy. Demand is the maximum level of real power which the electric utility must supp

Which interrupt has the highest priority, TRAP has the maximum priority ...

TRAP has the maximum priority There are 2 types of interrupts external and internal. NMI has highest priority between all external interrupts,TRAP has highest priority between

Dc generator, short note on armature reaction

short note on armature reaction

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd