why we perform survey work from whole to the part?

Related Discussions:- surveying

Chemical deterioration - underwater inspection of bridge, Define Chemical D...

Define Chemical Deterioration - Underwater inspection of Bridge? Chemical deterioration may occur in concrete, which has not been properly compacted, or through environmental p

Define ways of providing the anti slip device - by embedment, Define Ways o...

Define Ways of providing the anti slip device - By Embedment? A recess can be created in the bed block in which the elastomeric pad will be placed. The functioning of the reces

Compute the included angles, Example. With a surveyor compass the ang...

Example. With a surveyor compass the angles observed in traversing the lines AB, BC, CD, DE and EF are  as. Compute the included angles and indicate them in a neat sketch.

Corrosion, Distinguish between dry and wet corrosion

Distinguish between dry and wet corrosion

Road materials, Road Materials Earthwork and pavements constitute a si...

Road Materials Earthwork and pavements constitute a significant part of the cost of a road. Hence it is desirable that thorough investigations be done about the availability o

Concrete, what is the heat of hydration and gel space ratio?

what is the heat of hydration and gel space ratio?

#tile.., Material for formwork and their specifications

Material for formwork and their specifications

Environmental Question, An activated sludge tank treats 1 MGD from the pri...

An activated sludge tank treats 1 MGD from the primary clarify and has an X of 2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank and has

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd