Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was continued the total distance of 2km up to C at the end of the work chain was found to be 20 mm to long .find the correct distance of ABC

Related Discussions:- Surveying

Physical tests on cement, Physical Tests on Cement (a) Soundness Test: ...

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on

#title.roads., metal sizes required and adopted question #Minimum 100 words...

metal sizes required and adopted question #Minimum 100 words accepted#

What is raft foundation, Q. What is Raft Foundation? A raft or mat is c...

Q. What is Raft Foundation? A raft or mat is combined footing that covers the entire area beneath a structure and supports all the walls and coloumn when the allowable soil pre

Test for determination of shear modulus, Test for determination of Shear Mo...

Test for determination of Shear Modulus Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and un

Between capping beams and ground beams for piles, Question What is majo...

Question What is major disparity between capping beams and ground beams for piles? Answer Capping beams for piles plan to transferring loads from directly spaced c

Optical square, Using an optical square how would you perform a rectangular...

Using an optical square how would you perform a rectangular tie?

Explain the term - characteristic strength, Explain the term - Characterist...

Explain the term - Characteristic Strength The strength of  a material below which not more than 5 percent results are expected to fall is considered as the characteristic stre

Maintenance of earth roads, Maintenance of Earth Roads: The main task...

Maintenance of Earth Roads: The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd