Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was continued the total distance of 2km up to C at the end of the work chain was found to be 20 mm to long .find the correct distance of ABC

Related Discussions:- Surveying

Stacking of materials for building, briefly explain the stacking of materia...

briefly explain the stacking of materials in the site for general building?

Calculate the volume of excavation, Calculate the Volume of Excavation ...

Calculate the Volume of Excavation Using the information given in Figure, the volume of excavation in yd 3 is most nearly:   Solution: Use the average end area meth

Structural analysis 1, derive equation of radial pressure and loop stresses...

derive equation of radial pressure and loop stresses of thick cylinder

Grillage foundation, what are the advantages of grillage foundation and why...

what are the advantages of grillage foundation and why people prefers that?

What is function of mortar in brick walls, Q. What is Function of mortar in...

Q. What is Function of mortar in brick walls? A distinctive brick wall structure generally comprises the subsequent components:  (i)  Coping on top of the brick wall to prot

Equipments required for under water inspection of bridge, Define Equipments...

Define Equipments and tools required for under water Inspection of Bridge? Since the underwater inspection of stone masonry substructures involve only a cursory inspection of t

Survey, who to we calculate the RL at first point.

who to we calculate the RL at first point.

How to design banks, Q. How to design banks? When approach banks are of...

Q. How to design banks? When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious o

Construct the correct network for project, A project requires that activiti...

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd