Supplier Quality System

For important purchases, ensuring acceptable supplier quality is critical. Conducting supplier quality audit is one of the steps in making sure the selection of a capable supplier. A supplier quality audit should follow at least the below mentioned steps. The figure below describes the steps in supplier audit.

407_Supplier quality system.png

Figure : Supplier Quality Audit

Many quality methodologies are used in today's world including total quality management, six sigma and so on. The audit team verifies the methodology the supplier's employs and how it's being used.

Tools: The auditing team verifies how the supplier monitors the quality of the  product. One common used tool used is  Statistical  Process  Charts (SPC). SPC recognises an acceptable range of quality measurements and then graphs actual measurements both between upper and lower limits of acceptability and outside those limits.

Sampling arrangements - The audit team verifies the situation in case of mass production. In case of mass production, each and every unit made is not inspected. The audit questions as to how the supplier chooses the size and composition of inspected samples. Suppliers very frequently use numbers to gauge their quality performance. The supplier is asked to produce reports of few years with the metrics listed. The audit also checks if the supplier inspects the items before shipment. The inspection methodology used must be similar to the way the company actually evaluates conformance.

A purchasing system includes three major activities:

  • Specification of requirement.
  • Selection of a supplier.
  • Supply chain management.

The overall quality objective is to meet the needs of the purchaser with a minimum of incoming inspection or later corrective action, this objective in turn leads to minimising overall cost.

Goals and needs for suppliers must be aligned with those for each link in the supply chain, particularly the end user and the purchasing organisation. These goals and needs consist of quality parameters and general business issues.

For modern products, quality planning begins before a contract is signed. Such planning must recognise two issues:

  • A full understanding of the use of the product must be transmitted by the buyer to the supplier.
  • A product that meets all fitness-for-use requirements could be provided by the supplier and the information must be obtained by the buyer for sure.

The complexity of many modern products makes it tough to communicate usage needs to a supplier in a specification. Not only are the field usage conditions of  a complex product  sometimes poorly known,  but  also the internal environments surrounding a specific component may not be known until the complete product is designed and tested. For example: specifying accurate temperature and vibration requirements to a supplier of an electric component may not be feasible until the complete system is developed. Such cases require, at the least, continuous co operation between supplier and buyer. In special cases, it may be mandatory to award separate development  and production contracts to discover how to finalise requirements.

Situations might require two kinds of specifications:

  • Specifications defining the product requirements
  • Specifications defining the quality related activities expected of the supplier i.e. the supplier's quality system.

Defining required activities within a supplier's plant is sometimes necessary to ensure that a supplier has the expertise to conduct the full program needed for a satisfactory product. For few products, government regulations require that a buyer impose certain processing requirements on suppliers.

In case of complex products for which a supplier is asked to design and manufacture a product, the supplier can be required to include in the proposal a preliminary test plan; or other prediction; a failure mode, effect and criticality analysis; a reliability test plan or other reliability analyses.


Related Discussions:- Supplier quality system

Take the company to the next stage of its growth, The Board of PCC Company,...

The Board of PCC Company, which operates in the investment and risk management industry, has explained that in order to 'take the company to the next stage of its growth' there wil

NPV, A brilliant UTM student at the end of his graduation is in presence of...

A brilliant UTM student at the end of his graduation is in presence of two opportunities and has to choose between them. One is a job offer with a salary of Rs15,000 per month (wit

Principles of success for the project manager, Principles of Success for th...

Principles of Success for the Project Manager Project  managers  always  hire  the  best  people  available  and  then  do whatever it takes to keep the project up and running.

What are necessary features of the earned value management, What are the ne...

What are the necessary features of the Earned Value Management? Necessary features of EVM systems: a. A quantified project plan which identifies work or activities to be

Traditional definitions of quality, T raditional definitions of Quality ...

T raditional definitions of Quality There are various definitions of quality. According to quality pioneer Joseph M. Juran quality has two meanings that are very important for

Project communication management processes, Question: (a) The greatest ...

Question: (a) The greatest threats to many projects are failures to communicate effectively. (i) Elaborate on the Project Communication Management processes (ii) Briefly

Benefits of quality, B enefits of quality The benefits of quality in p...

B enefits of quality The benefits of quality in project performance are: C ustomer satisfaction: is the result of a quality product or project. If customers requirem

Quantitative layout analysis - travel chart, Quantitative Layout Analysis -...

Quantitative Layout Analysis - Travel Chart A basic tool that is primarily used to analyze the material handling cost or in certain cases number of moves in a process layout i

Drawbacks of poor planning and designs, Question 1: Explain why hotel m...

Question 1: Explain why hotel managers today are expected to be well-versed in Facilities Planning and Design Management. What according to you could be the drawbacks of poor

Project Management, Project Management Answer 1 The project selected for t...

Project Management Answer 1 The project selected for the purpose if analysis and for discussion of project management tools is of a marriage event, which is very much a real life

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd