Storage and handling of epoxy powder, Mechanical Engineering

Assignment Help:

Q. Storage and Handling of Epoxy Powder?

Coating materials shall be stored, handled and applied in strict accordance with procedures as outlined by the coating manufacturer, except where OWNER's specifications require otherwise. The powder shall be delivered in containers which are clearly labelled to identify the following:

a) Manufacturer's name

b) Product description

c) Mass of material

d) Batch number

e) Location of manufacture

f) Manufacturing identification number

Except as allowed in Clause 6.3.4, the powder shall be new and shall not be stored longer than 12 months at 77°F (25°C) and 50% relative humidity.


Related Discussions:- Storage and handling of epoxy powder

Internal energy - thermodynamics, Internal Energy (U): It is the energ...

Internal Energy (U): It is the energy possessed by the system on account of its configurations, and motion of atoms and molecules. Not like potential energy and kinetic energy

Find out the centre of gravity of a right circular cone, Find out the centr...

Find out the centre of gravity of a right circular cone: Find out the centre of gravity of a right circular cone of height H & the base radius a. Solution Refer to Fig

Estimate the weight of the casting, Estimate the Weight of the Casting ...

Estimate the Weight of the Casting A Yoke casting shown in Figure is to be produced by sand casting process. Estimate the weight of the casting if the density of the material

Find speed of dynamo shaft, Find speed of dynamo shaft: Q: W ith the...

Find speed of dynamo shaft: Q: W ith the help of belt an engine running at 200rpm drives line shaft. The Diameter of the pulley on engine is 80cm and the diameter of the pul

Manufacturing process, Deferentiate between hot working and cold working p...

Deferentiate between hot working and cold working processes

Predictive control algorithms, Predictive Control Algorithms Escaping S...

Predictive Control Algorithms Escaping Scheduling Errors via Partial Look-ahead Since previously mentioned above, the heuristic priority rules that are normally utilized in

Determine the stresses acting on the plan, Using Mohr's Circle Method deter...

Using Mohr's Circle Method determine the stresses acting on the plan as shown in figure. Also write the procedure.

Necessity of electrical system , Necessity of Electrical System Li...

Necessity of Electrical System Lights and horn for safe riding of vehicle even at night. Electricity for ignition of fuel in the engine. Battery Charging.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd