Stone Soling:

One of the early practices in road construction was to provide a stone soling 150-225 mm in thickness. The stones are laid by manual labour, and stone spalls are inserted and driven by hammer to fill up the voids. The layer is then rolled, applying blinding material such as sand, gravel, murram or screenings and watering. This specification is not practiced in India now because of the following disadvantages:

(a) It is practically impossible to fill up all voids. The voids left are then liable to be filled by the sub-grade soil working up. This will cause loss of strength when wet.

(b) There is no interlocking resistance because the stones are single size.


Related Discussions:- Stone soling - road pavements

Torque, A shaft 9 m long is subjected to a torque 30 t-m at a point 3 m dis...

A shaft 9 m long is subjected to a torque 30 t-m at a point 3 m distant from either end. The reactive torque at the nearer end will be?

Define safety precaution for underwater inspection of bridge, Define Safety...

Define Safety Precautions for Underwater Inspection of Bridge? The working agency should have its own diving safety manual, which should be strictly followed. This manual shoul

What is diversion tunnel in a dam, When a dam is to be built, a diversion t...

When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the

Environmental Question, An activated sludge tank treats 1 MGD from the pri...

An activated sludge tank treats 1 MGD from the primary clarify and has an X of 2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank and has

#surveying, Finding distances in tacheometric survey

Finding distances in tacheometric survey

Mixed ground with soils and boulders, Ground settlement occurs when pipe-ja...

Ground settlement occurs when pipe-jacking machine enters mixed ground with soils and boulders? The rate of cutting through soils is faster than cutting through boulders for pi

Stabilised pavement layers, Stabilised Pavement Layers: Soil stabilis...

Stabilised Pavement Layers: Soil stabilisation is the process of treating a soil in such a manner as to alter and improve its properties for use as a pavement layer on sub-gr

What is preset in bridge bearing, Q. What is Preset in bridge bearing? ...

Q. What is Preset in bridge bearing? 'Preset' is a method to decrease the size of upper plates of sliding bearings in order to save cost. Normal length of an upper bearing plat

Practice to form washout regulators, Question Why are two gate regulato...

Question Why are two gate regulators necessary in regular practice to form washout regulators ? Answer In fact, situation is analogous to that of fire hydrants in tha

Define cleaning for underwater inspection of bridge, Define Cleaning for Un...

Define Cleaning for Underwater Inspection of Bridge? Before any structure can be inspected, it is necessary to expose the surface material of the structure. Wherever there is m

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd