The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535°C in the boiler. The reheated steam is then expanded to 8.5bar at 378°C in the intermediate pressure turbine, after which a certain percentage of the steam is bled off to a feedwater heater. The remaining steam is then expanded through a low pressure turbine to 0.05 bar and a dryness fraction of 0.94. All 'steam' entering the feed pumps shall be a saturated fluid.  Produce a schematic diagram of the system, together with an appropriate T-s diagram. Using steam tables only, calculate

  1. The isentropic efficiencies of  the three turbines;
  2. The cycle efficiencies; 
  3. The percentage of steam bled off to the feedwater heater;
  4. The power generated by the turbines per unit mass of steam leaving the boiler;
  5. If the turbines generate 200MW power, how much cooling water must be used per hour, assuming that water can be returned to the river at only 10°C above its extraction temperature? (Assume that the specific heat capacity of water is 4.18 kJ/(kg·K));
  6. If a high pressure surface-type feedwater heater is placed between the boiler and HP feedwater pump to raise the feedwater temperature, configure the cycle and analyse the impact on the cycle performance.

Related Discussions:- Steam turbines

Elastomers, define elastomer.explain in details?

define elastomer.explain in details?

Preliminary analysis in mining industry, I have selected Mining Industry an...

I have selected Mining Industry and have selected three rival Mining Companies to conduct a preliminary analysis. I have done my bachelor's degree in Mechanical Engineering, I have

Heat treating equipment, Heat Treating Equipment: The major equipment...

Heat Treating Equipment: The major equipment for heat treatment is furnace. There are two main categories of furnaces - batch and continuous. The furnace selection needs cons

Design transfer facilities in plant, Q. Design Transfer Facilities in plant...

Q. Design Transfer Facilities in plant? Transfer facilities (e.g. pumps, piping, and conveyers) must be arranged so that no leaks can escape the confines of the bund / dike, an

Axial flow turbine, The mass flow rate is 28kg/s in an axial flow gas turbi...

The mass flow rate is 28kg/s in an axial flow gas turbine that develops 3.5MW. The stagnation conditions are 780KPa and 730 deg.C. at the entry. At the exit of the nozzle, the stat

Find out the centre of gravity of solid sphere, Find out the centre of grav...

Find out the centre of gravity of solid sphere: Find out the C. G. of a body formed by a solid sphere placed over a solid cylinder of similar radius a as illustrated in Figure

Determine the tension in the cord, Determine the tension in the cord: ...

Determine the tension in the cord: Two blocks containing the weights and positions illustrated in Figure rest on a frame which rotates around its vertical axis at a constant s

Assumptions in analysis of simple truss, Assumptions in analysis of simple ...

Assumptions in analysis of simple truss: What are assumptions made in analysis of simple truss? Sol.: The assumptions made in finding out forces in the frame are, (1)

Drag link mechanism, why there is a different angular velocity in the two c...

why there is a different angular velocity in the two cranks of a drag link mechanism?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd