Ensure all low points on steam mains and equipment have drip trap assembly. High pressure condensate to be taken to flash tanks, provide detail of flash tank. Use minimum 24" (610 mm) drip leg on preheat coils with entering air under 35°F (1.7°C). Indicate condensate tank and duplex pumps, (take vent line to roof as required). Ensure gravity drainage of condensate to condensate tank. Water level over condensate pump. Type of boiler selected. Ensure proper chemical treatment package. Schedule in specification complete.
Necessity of Battery To obtain power for ignition system. To obtain power for lighting. To obtain power for horn. To obtain power for self-starting.
what is clapper box
difference brtween parallel and unlike parallel forces
dgdsgsfd sfdsvdsfsdf dsfsdgsgdsfsada sfdsfdsvsdfsd sgghdfgsgfa
A load cell based on a simply-supported beam with rectangular cross-section is shown below. The beam is made using a tool steel alloy with E = 200 GPa, ν = 0.285. Two strain gages
tree branch trimmer
as diesel engine gives more milege than petrol engine then why we are using petrol engine..
Materials requirements planning: Materials requirements planning (MRP) is a set of process for converting forecasted demand for a manufactured product into a requirement sched
working with complete P.P.E
send me pipe designing material
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd