Steam systems - air-conditioning guidelines, Mechanical Engineering

Assignment Help:

Ensure all low points on steam mains and equipment have drip trap assembly. High pressure condensate to be taken to flash tanks, provide detail of flash tank. Use minimum 24" (610 mm) drip leg on preheat coils with entering air under 35°F (1.7°C). Indicate condensate tank and duplex pumps, (take vent line to roof as required). Ensure gravity drainage of condensate to condensate tank. Water level over condensate pump. Type of boiler selected. Ensure proper chemical treatment package. Schedule in specification complete.


Related Discussions:- Steam systems - air-conditioning guidelines

Design of connecting rod, Design of Connecting Rod: Design and analyse...

Design of Connecting Rod: Design and analyse the stress distribution in a connecting rod as shown in Figure 5. The axial load which the connecting rod carries is 1kN and the m

Shock absorbers, how bike''s hydraulic shock absorbers work?

how bike''s hydraulic shock absorbers work?

Calculate efficiency of turbine, (a) Explain briefly the functions of the s...

(a) Explain briefly the functions of the spiral casing guide vanes, and draft tube of a reaction water. (b) A Kaplan turbine developing 3250 KW under a head of 6m has a draft tu

Simple mechanism, differentiate between kinematic chain and mechanisms

differentiate between kinematic chain and mechanisms

Wire feeding unit-co2 welding, WIRE FEEDING UNIT The wire electrodes ar...

WIRE FEEDING UNIT The wire electrodes are supplied as continues coils in wire spools. The solid wires are available in the following sizes 0.8, 1.0, 1.2, 1.6, 2.0 and 2.4 mm di

How is metal removed in metal cutting, How is metal removed in metal cuttin...

How is metal removed in metal cutting ? Explain the process by giving simple model to explain the metal removed process. What are the different conditions that could allow a con

Determine the forces in strings, Determine the forces in strings: The...

Determine the forces in strings: The Electric light fixture weighing 15N hangs from point C , by two strings AC and BC . AC is inclined at 60° to the horizontal and BC

Joint details and preparations, Joint Details and Preparations Joints s...

Joint Details and Preparations Joints shall be prepared by machining, flame cutting with grinding to bright metal or air-carbon arc gouging with grinding to bright metal such t

Insulation on flanges and valves, Q. Insulation on Flanges and Valves? ...

Q. Insulation on Flanges and Valves? Valves, flanges, and unions shall not normally be insulated unless specified by OWNER. All other fittings are to be insulated. Fittings

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd