Ensure all low points on steam mains and equipment have drip trap assembly. High pressure condensate to be taken to flash tanks, provide detail of flash tank. Use minimum 24" (610 mm) drip leg on preheat coils with entering air under 35°F (1.7°C). Indicate condensate tank and duplex pumps, (take vent line to roof as required). Ensure gravity drainage of condensate to condensate tank. Water level over condensate pump. Type of boiler selected. Ensure proper chemical treatment package. Schedule in specification complete.
mathematical expression of moment of inertia
Results for the Underlying Problem The rules mentioned above and several variants of these rules that became out to be inferior are tested for eight various conditions of the
PROBLEM DEFINITION Inspiration for a product is most often the result of meeting a particular need or problem that existing products are not able to satisfy. When defining a
Describe various classifications of instruments and differentiate between null type and deflection of instruments with suitable examples.
In an orthogonal cutting test with a tool of rake angle 10 degree , the following observations were made. 20 Chip thickness ratio = 0.3 Width of cut = 6mm Uncut chip thicknes
Codes and Standards for steam generator All equipment purchased, and installation work done, shall be in accordance with the: • Canadian Electrical Code • Alberta Electri
A column of timber section 15cm x 20cm is 6 meter long both side being fixed. If the youngs modulus for timber is 17.5 KN/mm 2 , Evaluate: a) Crippling load and b) Safe load
Q. Molding methods according to the method of making a mold? Following are the molding methods according to the method of mold making: • Open mold method: the method is su
There is risk of wet H 2 S corrosion in all emulsion and gas lines from the Inlet Separator up to and including the Treater. Full compliance to NACE is highly recommended to contro
problems on law of polygon of forces
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd