Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Ensure all low points on steam mains and equipment have drip trap assembly. High pressure condensate to be taken to flash tanks, provide detail of flash tank. Use minimum 24" (610 mm) drip leg on preheat coils with entering air under 35°F (1.7°C). Indicate condensate tank and duplex pumps, (take vent line to roof as required). Ensure gravity drainage of condensate to condensate tank. Water level over condensate pump. Type of boiler selected. Ensure proper chemical treatment package. Schedule in specification complete.
what is the average speed of travel in gas tungsten arc welding
First law of thermodynamics applied to flow process
Q. Process of polymerization? The process of linking together of monomers, that is, of obtaining macromolecules is called "polymerization". It can be achieved by one of the two
Points and Crossings: Function Railway technology is based on an exclusive track for movement. For diverting trains from one track to another, some arrangements are n
Q. High temperature materials in Boilers? A thin refractory layer between the shield and boiler tube is recommended in areas subject to moderate temperatures and levels of corr
A flat belt, 8 mm thick and 100 mm wide transmits power between two pulleys, running at 1600 m/min. The mass of the belt is 0.9 kg/m length. The angle of lap in the smaller pulle
Q. Show the Welding Processes and Restrictions? Welding may be performed manually, semi-automatically and or automatically using any process or combination of processes accepte
explain ways of representing alternative quantities;1)phasor representation 2)graphical representation 3)complex waves 4)addition and subtraction of sine wave
Explain Cutting Speed - Cutting Parameters It is relative speed (V 1 ) between wheel and the Work piece. It is expressed in m/sec. V=Cutting speed=V 1 =
DRIVESHAFT SEALS Packed gland Sealed by several layers of asbestos or cotton yarn Sometimes used two boxes with intervening space separated by steam Problems: T
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd