statistics., Mathematics

Assignment Help:
the mean and standarddeviation of set a is -x ans s respectively.find the mean and standard deviation of set b

Related Discussions:- statistics.

Describe the introduction to integers, Describe the Introduction to Integer...

Describe the Introduction to Integers ? Integers include the positive and negative whole numbers, such as -4, -3, -2, -1, 0, 1, 2, 3, 4, and so on. A negative number has a "

Find the equation of circle concentric – coordinate geometry, 1. A point P(...

1. A point P(a,b) becomes (3,c) after reflection in x - axis, and (d,6) after reflection in the origin. Show that a = 3, b = - 6, c = 6, d = 2 2. If the pair of lines ax² + 2pxy

Equations of planes - three dimensional spaces, Equations of Planes Ear...

Equations of Planes Earlier we saw a couple of equations of planes.  Though, none of those equations had three variables in them and were actually extensions of graphs which we

Find out the slope of equations, Example:  find out the slope of equations ...

Example:  find out the slope of equations and sketch the graph of the line.                         2 y - 6x = -2 Solution To get the slope we'll first put this in slope

The sum of two consecutive integers is 41 integer, The sum of two consecuti...

The sum of two consecutive integers is 41. What are the integers? Two consecutive integers are numbers in sequence like 4 and 5 or -30 and -29, that are each 1 number apart. Le

Calculate the width of the river, A surveyor is hired to calculate the widt...

A surveyor is hired to calculate the width of a river. Using the example provided, Calculate the width of the river. a. 48 ft b. 8 ft c. 35 ft d. 75 ft

Work in volume problems, Work : It is the last application of integr...

Work : It is the last application of integral which we'll be looking at under this course. In this section we'll be looking at the amount of work which is done through a forc

How many cubic yards of concrete are required, A concrete retaining wall is...

A concrete retaining wall is 120 feet long with ends shaped as given. How many cubic yards of concrete are required to construct the wall? a. 217.8 yd 3 b. 5,880 yd 3

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd