The load from a continuous footing of 1.8 metres width, which may be considered to be a strip load of considerable length, is 180 kN/m2. Verify the maximum principal stress at 1.2 metres depth below the footing, if the point lies

(i)  directly below the centre of the footing,

(ii)  directly below the edge of the footing, and

(iii) 0.6 m away from the edge of the footing. What is the maximum shear stress at each of these points ? What is the absolute maximum shear stress and at what depth will it happen directly below the middle of the footing ?

 


Related Discussions:- State the term directly below the edge of the footing

CBR of soil, Why IRC 37-2012 has taken 90th percentile for pavement design ...

Why IRC 37-2012 has taken 90th percentile for pavement design of expressway or NH while they hav taken 80th percentile for state highway design ????????

Fundamental of physics, state and prove Heisenberg uncertainity principle?

state and prove Heisenberg uncertainity principle?

Define sample collection - clean water act, Define Sample Collection - Clea...

Define Sample Collection - Clean Water Act? The collection of the sample is able to have significant effects on the complete analytical process. Additionally, to make sure some

Survey, explain ranging and reciprocal ranging

explain ranging and reciprocal ranging

Define ways of providing the anti slip device - by embedment, Define Ways o...

Define Ways of providing the anti slip device - By Embedment? A recess can be created in the bed block in which the elastomeric pad will be placed. The functioning of the reces

Engg surveying, what does mean by too short and too long in erroneous tape ...

what does mean by too short and too long in erroneous tape length?

Solid mensuration, a street light is 15 ft directly above the curb. a 6 ft ...

a street light is 15 ft directly above the curb. a 6 ft man starts 10 ft down the street from the light and walks directly across the street which is 10 ft wide. when he reaches th

Main principle of post-grouting for mini-piles, Question What is main p...

Question What is main principle of post-grouting for mini-piles? Answer During course of post-grouting , a tube with a hole at its base is lowered into pile and g

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd