State the term directly below the edge of the footing, Civil Engineering

Assignment Help:

The load from a continuous footing of 1.8 metres width, which may be considered to be a strip load of considerable length, is 180 kN/m2. Verify the maximum principal stress at 1.2 metres depth below the footing, if the point lies

(i)  directly below the centre of the footing,

(ii)  directly below the edge of the footing, and

(iii) 0.6 m away from the edge of the footing. What is the maximum shear stress at each of these points ? What is the absolute maximum shear stress and at what depth will it happen directly below the middle of the footing ?

 


Related Discussions:- State the term directly below the edge of the footing

Ductility test, Ductility Test: The ductility of a bituminous binder ...

Ductility Test: The ductility of a bituminous binder is its ability to deform under load and return to its original condition after removal of the load. The property is deter

Streams not wholly alluvial - alluvial streams, Streams Not Wholly Alluvial...

Streams Not Wholly Alluvial In streams which are not wholly alluvial, consisting of bed of pebbles, rock, etc. the liner waterway is kept equal to the actual surface width of

Chemistry, What is the difference between scale and sludge

What is the difference between scale and sludge

Determine the station number - transportation, The local survey crew measur...

The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio

Write short note on surplus store, Q. Write short note on Surplus Store? ...

Q. Write short note on Surplus Store? Comprise stores which are surplus to requirements and include materials released from renewals and replacements as well as from dismantled

Assignment, Need assignment for structure concrete work

Need assignment for structure concrete work

Concrete, whats the role of gypsum in concrete?

whats the role of gypsum in concrete?

Calculate the energy loss in the piping system, The head (energy) loss in t...

The head (energy) loss in the piping system between points 1 and 7 is the most nearly. Solution: 3 ft. The difference between point 1 and point 7 = 10 ƒt - 7 ƒt = 3 ƒt

Fore bearing, find out the interior angleS with diagrame LINE AB, BC, CD, D...

find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''

Rcc and rbc, types mixing,curing,water cement ratio,qualities and workabili...

types mixing,curing,water cement ratio,qualities and workability

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd