State the term - constant eccentricity
A pre-stressed concrete beam has a width of 300 mm and an overall depth of 450 mm. The permissible stresses in tension and compression due to pre-stressing alone are 5 N/mm2 and 30 N/mm2, respectively. Find the required pre-stressing force in the tendon and the eccentricity of the tendon, if a straight tendon with a constant eccentricity is to be provided in the beam.
Define the term - Cracking Load and Proof Stress Cracking Load The load on the structural member at the time of the initiation of first visible crack in concrete is know
A piece of clay taken from a sampling tube has a wet weight of 1.553 N and volume of 95.3 cm 3 . After drying in an oven for 24 hours at 105°C, its weight 1.087 N. Suppose the spec
Tensile stresses It has been possible to introduce tensile stresses of upto 850 N/mm 2 in tendons with the use of this method. But the method is not suited in situations where
Explain the Hydraulic Radius (R) A fluid's cross-sectional area in flow divided by the wetted perimeter. For a circular channel flowing full and ½ full, R = D/4.
Some compound or metal vanishes under certain conditions is? Answer: Due to Super conductivity some compound or metal vanishes
Effect of concrete placing temperature on early thermal movement Rate of hydration of cement paste is related to placing temperature of concrete. Rate of heat production is giv
Ask questa) In an unloaded propped cantilever, the propped end sinks vertically relative to the fixed end by an amount ? due to poor construction of the foundation of the prop. Wha
how to calculate grading modulus
Design approach for the spacing of min-piles For close spacing of min-piles, it would provide substantial cost savings with reduction of pile cap size. Though close spacing of
Calculate the Total Duration for the Four Activity Project Solution: Scheduling work activity has associated time duration. The durations shown in the Table were e
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd