State the method of Pre- Tensioning
It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concrete develops a bond with the surface of stretched tendons. When sufficient bond strength is developed in concrete so as to retain stretched tendons in their tensioned form, tendons are cut from outside. The inside embedded length of tendons keeps its stretched form inside concrete due to bond and the prestressing force is maintained inside concrete.
In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material? There are two
Determine the stresses set up in the brass: A compound bar is constructed from three bars 50 mm wide by 12 mm thick fastened together to form a bar 50 mm wide by 36 mm thick.
1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su
Explain the Hydraulic Gradient A measurement of the movement of water over distances. Change in hydraulic head from one monitoring point to another. i = ΔH/L units are typ
Q. Complete embedment of pipelines into thrust blocks For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surfac
Q. What do you understand by Percolation of water? Percolation of water into the ground or embankment takes place, causing rise in water table and / or saturation of the body.
how can I come up with the research on the water bound macadam road construction
Classification of the damage according to the type of structures The level of damage in spatial trusses has also been classified into three different levels based on th
what are the problems in traditional marine pilling system of steel tubular pile with concrete infill
Millennium mills redevelopment project assignment in group Presentation
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd