State the method of pre- tensioning, Civil Engineering

Assignment Help:

State the method of Pre- Tensioning

It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concrete develops a bond with the surface of stretched tendons. When sufficient bond strength is developed in concrete so as to retain stretched tendons in their tensioned form, tendons are cut from outside. The inside embedded length of tendons keeps its stretched form inside concrete due to bond and the prestressing force is maintained inside concrete.


Related Discussions:- State the method of pre- tensioning

Determine the coefficient of compressibility, A saturated clay layer 4 m th...

A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o

Explain the categories of air pollution, Explain the Categories of Air Poll...

Explain the Categories of Air Pollution 1. Ambient Air Pollution Out door environment o Involves complex array of sources and pollutants, meteorological transport of th

Chain surveying, describe setting out right angle at given point on a chain...

describe setting out right angle at given point on a chain line and when the point lies outside the chain line

Obstacles, Obstacles which can be ranged

Obstacles which can be ranged

Plumbing technology, This assessment will test Learning Outcomes 3 and 4 as...

This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expect

Void ratio, a soil sample is 38mm in diameter and 76mm and in its natural c...

a soil sample is 38mm in diameter and 76mm and in its natural condition weighs 168g.when dried completely in an oven weighs 13o.5g.the value of Gs is 2.73.what is the degree of sat

#title., desirable properties in green concrete

desirable properties in green concrete

Hoyers long line system pre-tensioning, Hoyers long line system pre-tension...

Hoyers long line system pre-tensioning When concrete attains the required strength,  jacks  are released and tendon wires in-between various units are cut.

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd