State the maximum amount of resistance in a pole, Civil Engineering

Assignment Help:

State the maximum amount of resistance in a pole

The maximum amount of resistance in a pole is generally required at the base and, so, the maximum cross sectional area is required at the base section. Poles are generally tapered with a hollow core to reduce the weight. For small lengths of upto 12 m length, square or rectangular cross sections are generally provided. These shapes are easy to construct and transport. I-section shapes are also provided to the poles. However, these may be prone to more corrosion as a larger area of the surface may be exposed to environment. Tubular sections are preferred for large lengths of poles.

 


Related Discussions:- State the maximum amount of resistance in a pole

Briefly explain about artificial cut offs, Q. Briefly explain about Artific...

Q. Briefly explain about Artificial cut offs? Alignment of a cut off is chosen so that approach and exit ends remain more or less tangential to the river course. A cut off can

Load transmission, • The transmission of load through a structure can be co...

• The transmission of load through a structure can be complex but in any particular case            - The applied load can usually be classified into 4 types                •

Benchmark, 1. Where permanent bench of india located ? 2. use of Permanent ...

1. Where permanent bench of india located ? 2. use of Permanent BenchMark ?

Glazed tiles for construction material, Q. Glazed tiles for Construction Ma...

Q. Glazed tiles for Construction Material? Glazed tiles are only meant for dadoes of bath room, Toilet and kitchens etc as they have no strength . Normally 8'' x 4'' g

Explain the process of directed track maintenance, Q. Explain the process o...

Q. Explain the process of Directed Track Maintenance? DTM is a method to maintain the track is directed every day and not as a prescribed routine. DTM essentially consists of n

Afflux in rivers with non scourable bed, Q. Afflux in rivers with non scour...

Q. Afflux in rivers with non scourable bed? Afflux is defined as rise of flood level of the river upstream of a bridge as a result of the obstruction to natural flow caused by

Define the finish-to-start dependency, Sheet rock cannot be installed in th...

Sheet rock cannot be installed in the new house you are building until a building inspector approves the plumbing, electrical, HVAC, and insulation.  This is an example of:

Define limitations of underwater magnetic particle testing, Define Limitati...

Define Limitations of Underwater Magnetic Particle Testing? As with any non-destructive test method, UWMT has some limitations as under: i. Underwater magnetic particle tes

Scheming thermal reinforcement, Question What is importance of critical...

Question What is importance of critical steel ratio in scheming thermal reinforcement ? Answer Execution of critical steel ratio resources that in construction joints,

What is a footing foundation for a water tower, A footing foundation for a ...

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd