State the laws governing compaction of cohesion less soils, Civil Engineering

Assignment Help:

a) What are the laws governing compaction of

(i) cohesion less soils like sand and

(ii) moderately cohesive soils like sandy clay ?

b) To what compaction pressure does the Standard Proctor Test correspond? Show how the standard proctor test can be modified to suit the compacting machinery actually used at site for the efficient compaction of embankment.

 


Related Discussions:- State the laws governing compaction of cohesion less soils

FOUNDATION, TYPE OF FOUNDATION IN LATERITE SOIL

TYPE OF FOUNDATION IN LATERITE SOIL

Project management, Project Management: This unit starts with the gene...

Project Management: This unit starts with the general definition of Project management. Several phases involved in project management are also desribed. Further, the technique

Purification and treatment of water, Purification and Treatment of Water: ...

Purification and Treatment of Water: In purification and treatment of water, we have discussed the important treatment process which is commonly used in making raw water from

Use of stone aggregates in road construction, Use of Stone Aggregates in Ro...

Use of Stone Aggregates in Road Construction Stone aggregates are extensively used in roads in pavement layers. They are obtained from natural rock. The following geological

Surving, describe the methods of reducing the levels,and their relative adv...

describe the methods of reducing the levels,and their relative advantages and disadvantages.

Sampling distribution and approximations of distributions, Sampling Distrib...

Sampling Distribution And Approximations Of Distributions: 1) Learnt three approaches for deriving the probability distributions of functions of one or more random variables v

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Assignment, Need assignment for structure concrete work

Need assignment for structure concrete work

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd