State the design process of prestressed concrete, Civil Engineering

Assignment Help:

State the Design process of Prestressed Concrete

Most of the times, the design process is an interactive and trial procedure in which the cycle of analysis - design - analysis is followed. For the structure which is to be designed, we have to estimate the loads, consider trial sections for the structure and analyse it for the internal forces and moments etc., induced due to external loads. Then the structure is designed and re-analysed for the induced internal stresses. If these induced stresses exceed material strengths then the design is to be modified. The primary object of structural design is to provide a structure with safety and economy during its entire service life.


Related Discussions:- State the design process of prestressed concrete

Co, compressive stenght assigments.

compressive stenght assigments.

Explain the swell factor of soil, Explain the Swell Factor of Soil A so...

Explain the Swell Factor of Soil A soil's swell factor represents the fact that the volume of soil placed by nature in the ground is not the same as the volume of the same mass

Simply supported beam, draw the shear force and bending moments of a beam

draw the shear force and bending moments of a beam

Cement, Ask What is the density of cement?

Ask What is the density of cement?

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Plot vertical displacement - cantilever beam, 1. The cantilever beam-like s...

1. The cantilever beam-like structure  shown below is modeled  using  a 2 x 10 mesh of rectangular four-node plane stress elements of equal size. Do the following and compare with

Environmental Question, An activated sludge tank treats 1 MGD from the pri...

An activated sludge tank treats 1 MGD from the primary clarify and has an X of 2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank and has

Self compacting concrete, what will be the w/c ration and cement/fly ash ra...

what will be the w/c ration and cement/fly ash ration for the particular mix design

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd