For prestressed concrete members, the high-tensile steel, used generally, consists of wires, bars or strands. The high tensile strength of steel is generally achieved by marginally increasing the carbon content in steel in comparison to mild steel. High-tensile steel usually contains 0.6 to 0.85% carbon, 0.7 to 1 % manganese, 0.05% of sulphur and phosphorus. The high carbon steel ingots are hot rolled into rods and cold drawn through a process of dies to reduce the diameter and increase the tensile strength. The durability of wires gets improved due to the cold-drawing operation. The cold-drawn wires are then tempered to improve their properties. Tempering or ageing or stress relieving by heat treatment of wires at 150-420°C improves the tensile strength. These cold-drawn wires are generally available in nominal sizes of 2.5, 3,4,5,7 and 8 mm diameter.  #question..


Related Discussions:- State about the prestressing steel

State the problem and phases of site investigation, State the Problem and p...

State the Problem and phases of site investigation The site investigation is to be performed to obtain the solution for the following problems: i)  Foundation problems ii

Explain the activitated sludge (aeration tank), Explain the Activitated Slu...

Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p

Rectangular tie, using an optical square how would you perform a rectangula...

using an optical square how would you perform a rectangular tie?

Monitoring state of reclamation, Question Geotechnical Instrumentation ...

Question Geotechnical Instrumentation is often employed for monitoring state of reclamation . From time to time two piezometers are installed inside same borehole. What is mai

What is load carrying capacity of a pile, Q-  What are loads and forces ta...

Q-  What are loads and forces taken into account for designing a pile and what is load carrying capacity of a pile. Ans. For designing a pile the following loads and force ar

Cement testing, explain the importance of following standard procedure

explain the importance of following standard procedure

Jacking face for pipe-jacking, Ground settlement occurs ahead or behind the...

Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti

Bridge engineering, long span bridge or continuous bridge which is more pre...

long span bridge or continuous bridge which is more preferable and why ??? what is the major problem in continuous bridge and what would be its effect if there is any differential

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd