Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
State about the Prestressing Steel
For prestressed concrete members, the high-tensile steel, used generally, consists of wires, bars or strands. The high tensile strength of steel is generally achieved by marginally increasing the carbon content in steel in comparison to mild steel. High-tensile steel usually contains 0.6 to 0.85% carbon, 0.7 to 1 % manganese, 0.05% of sulphur and phosphorus. The high carbon steel ingots are hot rolled into rods and cold drawn through a process of dies to reduce the diameter and increase the tensile strength. The durability of wires gets improved due to the cold-drawing operation. The cold-drawn wires are then tempered to improve their properties. Tempering or ageing or stress relieving by heat treatment of wires at 150-420°C improves the tensile strength. These cold-drawn wires are generally available in nominal sizes of 2.5, 3,4,5,7 and 8 mm diameter. #question..
State the Problem and phases of site investigation The site investigation is to be performed to obtain the solution for the following problems: i) Foundation problems ii
Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p
using an optical square how would you perform a rectangular tie?
Question Geotechnical Instrumentation is often employed for monitoring state of reclamation . From time to time two piezometers are installed inside same borehole. What is mai
Q- What are loads and forces taken into account for designing a pile and what is load carrying capacity of a pile. Ans. For designing a pile the following loads and force ar
explain the importance of following standard procedure
defination
Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti
long span bridge or continuous bridge which is more preferable and why ??? what is the major problem in continuous bridge and what would be its effect if there is any differential
explain it
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd