Stakeholders - legal requirements for distribution licensees, Electrical Engineering

Assignment Help:

Stakeholders - Legal Requirements for Distribution licensees

There have to be consultations among several stakeholders such as the licensees, the governments, consumers, generating companies, and regulatory bodies about all these matters. All stakeholders will have to meet certain primary requirements for these reforms to move full steam ahead. We spell them out briefly before ending this section.

The licensee should

  1. Recover the cost of the organization and make reasonable profit; and
  2. Make adequate investments for meeting the existing and projected demand.

The government should

  1. See to it that the tariffs are reasonable and easily acceptable; and
  2. Provide minimum subsidy.

The generating company should ensure

  1. Mutually agreed PPA with cost plus recovery; and
  2. Schedule management

The consumers should

  1. Accept reasonable tariff; and
  2. Demand improved quality of service with minimum impact on the current prices.

The regulatory staff has to

  1. Encourage efficient use of resources through the licensee so that maximum benefit is made available to the consumer; and
  2. Ensure long word financial viability of utility. The advisory committee should
  3. Protect the interest of every category of consumer; and
  4. Ensure quality of supply and standard of performance.

We now present a few case studies to help you appreciate the impact of the distribution reforms on the power sector.


Related Discussions:- Stakeholders - legal requirements for distribution licensees

Current and voltage polarity, why Direct current flow through semiconductor...

why Direct current flow through semiconductors but alternating current cannot flow?

Compute the efficiency of the transformer, Q. These data were obtained from...

Q. These data were obtained from tests carried out on a 10-kVA, 2300:230-V, 60-Hz distribution transformer: • Open-circuit test, with low-voltage winding excited: applied voltag

Network analysis, what are the advantages and disadvantages of Thevenin the...

what are the advantages and disadvantages of Thevenin theorm over Norton theorem

Off line ups system - power supplies , Off line UPS System Again the tw...

Off line UPS System Again the two  switches  are used in this  type of ups  as online  ups. The difference  is that  here  the main  static  switch  remains normally  ON and UP

Sketch the phasor diagram of the voltage, Q. The line-to-line voltage of a ...

Q. The line-to-line voltage of a balanced wye connected three-phase source is given as 100 V. Choose V AB as the reference. (a) For the phase sequence A-B-C, sketch the phasor

Determine line voltage for the y- connected machine, A 3-phase, 16-pole syn...

A 3-phase, 16-pole synchronous machine is driven by a prime mover at a speed of 600-rpm with the stator open circuited. The rotor flux per pole is 0.025-Wb. Determine (a) the fr

Evaluate complex power in power system, Q. Evaluate complex power in power ...

Q. Evaluate complex power in power system? The complex power ¯S in a single-phase systemis the complex sum of the real (P) and reactive (Q) power, expressed as follows:

What are the different types of mosfet transistors, Q. What are the differe...

Q. What are the different types of MOSFET transistors ? The metal-oxide semiconductor field-effect transistor (MOSFET) is a three-terminal active device which has many applicat

Threshold switching voltage, Analogue Threshold switching a) Include a...

Analogue Threshold switching a) Include a variable potential divider to the schematic diagram to control the transistor base voltage b) Include the potential divider compon

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd