Sprinkler system - fire protection engineering, Other Engineering

Assignment Help:

Sprinkler system - fire protection engineering

Sprinkler systems may be installed in a building to achieve a number of different objectives.  Very often the primary reason for installation is property protection.   For taller, larger and more complex buildings sprinklers are often installed to help protect life.

There are few sprinkler systems that are designed to fully extinguish a fire, most are designed to control and contain a fire.  If they happen to put the fire out as well, as they often do, then this is a bonus.  Early Suppression Fast Response (ESFR) sprinklers are used in some warehousing buildings and these are designed to extinguish the fire fully.

The sprinklers are designed to throw a sufficient quantity of water onto the items around the fire and onto the walls and ceiling of the building to stop these items from catching fire.  The ceiling above a fire is subjected to very high temperatures and it is important that sprinkler heads throw sufficient water up onto the ceiling to protect it from the fire.

Sprinkler systems are often fed from their own dedicated water tanks and the supplies have to last for a specified period of time, typically 1, 1½ or 2 hours.  For life safety purposes it would be expected that there are two tanks or the tank is split into two halves with each half being capable of feeding both of the supply pumps.

 

 

 


Related Discussions:- Sprinkler system - fire protection engineering

Numeric computation matlab, Expertsmind.com offers Performing Numeric Comp...

Expertsmind.com offers Performing Numeric Computation matlab assignment help MATLAB contains numbers, precise, and technological innovation features to support all common tech

Geology, write and explain the different geophysical methods

write and explain the different geophysical methods

Building economics, with sketches,describe single upper flows

with sketches,describe single upper flows

Npv, Problem 1 Suppose a company is considering two independent projects, P...

Problem 1 Suppose a company is considering two independent projects, Project A and Project B. The cash outlay for Project A is $14,000. The cash outlay for Project B is $20,000. T

Compton''s effect, When a beam of monochromatic x ray is incident on a grap...

When a beam of monochromatic x ray is incident on a graphite block, it get scattered and scattered wavelength is larger than that of the incident radiation wavelength. This scatter

Present worth equivalence in economical engineering, Present Worth equivale...

Present Worth equivalence: Since we have developed the relationship to find a future value F given a present value P, we can easily derive the formula to find a (P|F, i, n), w

Homework, Assume that a movie is two hours long, that the frame rate is 30 ...

Assume that a movie is two hours long, that the frame rate is 30 frames per second, and that the resolution per frame is 1080i (1920×1080 pixels per frame), and that each pixel is

Systems Engineering, critically analyses the system design process of a pro...

critically analyses the system design process of a project for a light railway link for a city

Base case NPV analysis , How base case NPV analysis is applied in financial...

How base case NPV analysis is applied in financial risk management

Aerospace engineering, Define the aircraft axes & degrees of freedom. Analy...

Define the aircraft axes & degrees of freedom. Analyse the different maneuvers that can be done by an aircraft.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd