Sprinkler system - fire protection engineering, Other Engineering

Assignment Help:

Sprinkler system - fire protection engineering

Sprinkler systems may be installed in a building to achieve a number of different objectives.  Very often the primary reason for installation is property protection.   For taller, larger and more complex buildings sprinklers are often installed to help protect life.

There are few sprinkler systems that are designed to fully extinguish a fire, most are designed to control and contain a fire.  If they happen to put the fire out as well, as they often do, then this is a bonus.  Early Suppression Fast Response (ESFR) sprinklers are used in some warehousing buildings and these are designed to extinguish the fire fully.

The sprinklers are designed to throw a sufficient quantity of water onto the items around the fire and onto the walls and ceiling of the building to stop these items from catching fire.  The ceiling above a fire is subjected to very high temperatures and it is important that sprinkler heads throw sufficient water up onto the ceiling to protect it from the fire.

Sprinkler systems are often fed from their own dedicated water tanks and the supplies have to last for a specified period of time, typically 1, 1½ or 2 hours.  For life safety purposes it would be expected that there are two tanks or the tank is split into two halves with each half being capable of feeding both of the supply pumps.

 

 

 


Related Discussions:- Sprinkler system - fire protection engineering

Electro-mechanical fuel control, Electro-mechanical fuel control: The s...

Electro-mechanical fuel control: The start fuel valve and ignition are energised as soon as rotation (3%) is sensed by an Electronic Sequence Unit (ESU). At 14% and with risin

Flight control - state feedback, If all states are measured by appropriate ...

If all states are measured by appropriate sensors and interfaced to the flight control computer then allthe states may be fed back and there is no restriction on the choice of K. S

Quality assurance, Graduate project in the field of quality assurance

Graduate project in the field of quality assurance

Mine engineering, Students are to undertake a tunnel blast design for the f...

Students are to undertake a tunnel blast design for the following conditions: • Tunnel is 5.5m wide by 5.5.m high • Rock is a sandstone with a UCS of 400 MPa • Drill hole diameter

Calculate the maximum amount of recoverable resource, A 30m deep quarry pit...

A 30m deep quarry pit is to be constructed in a jointed basalt rock mass. The quarry management wants to maximise the side wall inclination to 70° for economic reasons. The geologi

Time value of money-inflation-interest rate-opportunity cost, Time Value of...

Time Value of Money Consider your cheese steak hoagie business. Assume that Phillies will win another World Series, and your business will be hired to serve a party that will

Explain in brief about priority rules for scheduling?, Question 1 A large ...

Question 1 A large number of forecasting methods are available. Discuss the categories of forecasting methods Question 2 Explain how economic order quantity can be calculated

.quantifying financial risk, What is the standard deviation of return if we...

What is the standard deviation of return if we have the following two possible outcomes: a rise of 8.00 per cent with 0.58 probability or a fall of -6.00 per cent?

Architectural graphics, How to draw schiography in a perspective view of an...

How to draw schiography in a perspective view of an object

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd