Soil particles for geotechnical design, Civil Engineering

Assignment Help:

Question

Will it worthwhile to take out tests on particle density of soil particles for geotechnical design?

Answer

Particle density of soils is definite by ratio of soil particle mass and soil element volume. Depending on soil category, range of variation of soil particle thickness varies not drastically as in by percent. So, it might not be useful to order laboratory tests and incur additional expenditure just to decide particles density by recognizing that variation of particles density is not significant.

 

 


Related Discussions:- Soil particles for geotechnical design

Lateral load, http://www.expertsmind.com/questions/tributary-lateral-load-3...

http://www.expertsmind.com/questions/tributary-lateral-load-30133097.aspx

Hybridisation, Why hybridisation never take in isolated atom

Why hybridisation never take in isolated atom

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Determine the uses of screw connectors, Determine the uses of Screw connect...

Determine the uses of Screw connectors Screw connectors are normally used  to splice large-diameter high-tensile strength bars. The bars are threaded at the ends and a sheet-me

Direct levelling, to find height difference between two or more points in d...

to find height difference between two or more points in different conditions

Purpose of setting minimum amount of longitudinal steel area, Q. Purpose o...

Q. Purpose of setting minimum amount of longitudinal steel areas for columns? In some design codes it specifies that area of longitudinal steel reinforcement must be not less

Quality control of concrete roads, Quality Control of Concrete Roads: ...

Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Batching of concrete, Introdaction , volume batching , weighat batchin...

Introdaction , volume batching , weighat batching , mesaring of water

Steel truss 15 m span, types of truss of 15 m cantilever with 1000 kg on fr...

types of truss of 15 m cantilever with 1000 kg on free end. May be steel or any lightest material aluminium anodized truss. thanks

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd