software project, Project Management

Assignment Help:
Scenario:
You are a member of the Project Review team for CK Software Services. At the next meeting, the team will discuss the scheduling for the new automated teller machine (ATM) software the company is building. You have been selected to lead the team that will develop the Financial Transactions (FINAT} module based upon the architecture decomposition (ADV) shown in Figure 5.4 on page 178 and the Work Breakdown Structure ( WBS) shown in Figure 5.5A and Figure 5.5B on pages 179-180. The estimates for the detailed tasks are shown below for your convenience.

Prepare the preliminary schedule by completing each of the following.
1. Choose the development model being used for the FINAT project. State the name of the development model/process.
2. Define where you would place the milestones for the FINAT project and prepare a milestone list using a structure similar to Table 5.5 on page 189. Remember that this is part of a larger project where the top-level architecture decomposition (ADV) has been determined. You must then include consideration of how your FINAT project fits into the overall project. That means you need to include one or more milestones that will enable your project to smoothly integrate into the ATM project.
3. Prepare a critical path activity network for the tasks showing the information listed below. Figure 5.6 on page 189 shows an example. You may use Microsoft Project, Visio, or another appropriate drawing tool. The critical path activity network is a directed graph showing the milestones as nodes in the graph with directed edges showing the workflow.
a. Milestones that you identified in #2 above.
b. Concurrent and sequential tasks as needed for your development model/process.
c. Include the individual tasks with the duration for each (shown in parentheses on each edge of the graph). Label each edge with the task “number” and duration.
d. Calculate and state the total number of weeks in the schedule.
e. Identify the critical path by showing the edges in a different color or with a “bold” edge symbol.
4. Prepare a week-by-week staffing profiles for the FINAT project as listed below. Show each in a separate table. Figures 5.11 and 5.12 on page 197 show example profiles for EST and LST calculations.
a. Prepare a staffing profile that gives the most-ideal staffing plan you can devise. That is, arrange your projects so that you satisfy the required workflow but have the most constant staffing plan. The ideal staffing profile is shown in Figure 5.13 on page 198.
5. Extra Credit: Prepare 3 Gantt charts for the FINAT project, one that show the schedule to accomplish each staffing profile.



Detailed Task Estimates (Refer to Figures 5.5A and 5.5B on pages 179-180)
Task Number of Staff Duration in Weeks
3.2.1.1 2 2
3.2.1.2 1 3
3.2.1.3 2 2
3.2.2.1 2 4
3.2.2.2 3 5
3.2.2.3 2 3
3.2.3.1 1 2
3.2.3.2 2 2
3.2.3.3 1 3
3.2.4.1 3 1
3.2.4.2 2 3
3.2.4.3 2 1
3.2.5 4 3

Related Discussions:- software project

What are the primary objectives of transferring risks, Question : (a) ...

Question : (a) Define risk as per the Public Private Partnership Guidance Manual. (b) What are the primary objectives of transferring risks from a contracting authority to

Process of packaging and labeling of the product, Q. Process of Packaging a...

Q. Process of Packaging and labeling of the product? Packaging of biscuits involves both the primary and secondary packets. These primary package should be laminated paper whi

What are the approaches to allocate factory overheads, What are the approac...

What are the approaches to allocate factory overheads? Product costing allocation methods - Plant wide allocation, Department allocation, Activity based allocation

Project Management, Project Management Answer 1 The project selected for t...

Project Management Answer 1 The project selected for the purpose if analysis and for discussion of project management tools is of a marriage event, which is very much a real life

Report and presentation, I want report on this article in 1500 words and pr...

I want report on this article in 1500 words and presentation my article is Huber, M., Van Boven, L., McGraw, A.P. and Johnson-Graham, L. 2011. Whom to help? Immediacy bias in judge

Project management value measurement process, Project Management Value Meas...

Project Management Value Measurement Process Value management is a process which will have to be used throughout the project.  The  different  tools  and  techniques are availa

Calculate the elapsed time of the critical path project, Calculate the elap...

Calculate the elapsed time of the critical path project when A Critical path of ACDEFGIJ is given below and the elapsed time of the project is 25 weeks. Th

Feasibility Study, Want to create a feasibility study for class assignment ...

Want to create a feasibility study for class assignment using consulting firm as my entrepreneur business located in Charlotte, North Carolina USA question..

What communication do i need, Q. What communication do I need? Communic...

Q. What communication do I need? Communication is possibly one of the most important functions of a project manager and yet sometimes the least understood. With no people there

Scheduling in program management, Scheduling  Once a program plan is ap...

Scheduling  Once a program plan is approved, good scheduling is the heart of the program management process. Program schedules provide adequate time to ensure that the work bre

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd