site plan, Civil Engineering

Assignment Help:
can I have some help with a site plan. I want it on autocad, I have all the dimmension

Related Discussions:- site plan

Orientation of wing walls in designing of bridge abutments, Question Wha...

Question What is consideration in selecting an orientation of wing walls in designing of bridge abutments ? Answer There are three familiar arrangements of wing walls in

Structural dynamics, A machine of 850 kg mass is acted upon by an external ...

A machine of 850 kg mass is acted upon by an external force of 1355 N at a frequency of 650 rpm. To reduce the effects of vibrations on the supporting structure, isolators having s

Reasons for blockage in pumping concrete, Q. Reasons for blockage in pumpin...

Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction

Explain the erosion and sedimentation, Explain the Erosion and Sedimentatio...

Explain the Erosion and Sedimentation Erosion: Removal of soil or other channel material caused by the rapid movement of water over the channel surface. The removed material

Water piped scheme, how to use mood diagram to get f and other Re

how to use mood diagram to get f and other Re

Surveying, Explain about reciprocal ranging

Explain about reciprocal ranging

Penetration test, Penetration Test: A viscosity is measured indirectl...

Penetration Test: A viscosity is measured indirectly by the penetration of a standard needle under standard conditions of load, time and temperature. The test measures the ha

Pavement drainage, Pavement Drainage: Water enters the pavement layer...

Pavement Drainage: Water enters the pavement layers through cracks, joints and open spaces in the pavement surface. The water reaches the soil sub-grade on which the pavement

Amount of water that added to achieve the optimum moisture, Geotechnical pr...

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd