Simulation and optimization software, Software Engineering

Assignment Help:

A one-car taxi company receives an average of 18 calls per day. The receptionist takes down details of the requested journey and relays them to the driver by radio. Each passenger's journey takes 25 minutes on average. The working day is 12 hours long.

(i) What constitutes the queue in this particular situation?

(ii) How long, on average, will a client have to wait between placing a pickup call and the arrival of the taxi?

(iii) During this waiting time, how many other clients on average will be picked up by the taxi? (Think about the number of people already waiting in queue when a customer arrives.)

(iv) List all the necessary assumptions for your calculations in (ii) and (iii). For each assumption, explain briefly whether you think they may or may not be realistic in this particular example.

(v) What is the probability that the time between two successive calls will exceed one hour?

(vi) What would your answer to (ii) be if the mean of the service time remains the same but the standard deviation is 15 minutes? What type of queuing system is this?

(vii) Based on observation, the more taxis a company operates, the more calls it receives. If the company operated a second car, what rate of calls would result in the same average waiting time as with one car? Express your answer in terms of the average interval between calls.

(viii) The annual costs of operating the company are as follows:

Office and receptionist (for either 1 or 2 cars) £30,000

Fixed costs per car (depreciation, tax etc.) £5,000

Drivers' wages £20,000

The variable costs per car (petrol etc.) are £18/day, when operating full-time.

For the one-car case described in (i)-(iv), and for the two-car case in (vii), calculate the average charge per client necessary to break even. Assume 300 working days per year.


Related Discussions:- Simulation and optimization software

SRS, What are the advantage and disadvantage of SRS?

What are the advantage and disadvantage of SRS?

Briefly describe what are deployment diagrams, Question: (a) Compare t...

Question: (a) Compare the following pairs of terms as used in object oriented software engineering: (i) Association and Association class (ii) Multiplicity and multiple

Define the associative memory, Associative Memory:- The time needed to ...

Associative Memory:- The time needed to find an item stored in memory can be decreased considerably if stored data can be identified for access by the content of the data itsel

Project or process, Mentoring a class at a university. is project or proce...

Mentoring a class at a university. is project or process??

Explain branch testing, Testing method to satisfy coverage criteria which n...

Testing method to satisfy coverage criteria which need that for each decision point, every possible branch [outcome] be implemented at least once. Contrast with testing, path; test

State the term software is engineered, Justify the term "Software is engine...

Justify the term "Software is engineered" Software is engineered not manufactured. Although some similarities exist between software development and hardware manufacture, the t

What condition exists after performing validation testing, What are the con...

What are the conditions exists after performing validation testing? After performing the validation testing there two situations arise. The function or performance characterist

What is code coverage and code inspection, What is Code Coverage and Code I...

What is Code Coverage and Code Inspection - This is an analysis method which verifies which parts of the software have already been covered by the test case suite and which are

Explain the limitations of testing, Q. Explain the limitations of testing? ...

Q. Explain the limitations of testing? Ans: Though testing is an significant part of system development and leads to a verified, valid and efficient system it as well faces s

Write about the types of project plan, Write about the types of project pla...

Write about the types of project plan. Quality plan - This plan explains the quality procedures and standards that will be used in a project. Validation plan - This plan explai

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd