Significance of tailwater level in culverts

Headwater level and tailwater level of culverts are significant parameters in hydraulic design. Headwater level can't be set too large, or else flooding upstream may take place leading to the loss of life and properties. Conversely tailwater level of culverts has to comply with the following requirements: 

(i)  For low tailwater levels at the outlet of culverts, small depths of flow can cause vital erosion of downstream channels.

(ii) For high tailwater levels, it can cause the culvert upstream to be flowing full or even under submerged condition. The headwater level is increased in order to flow through culvert and this in turn increases flooding risk related with high headwater level.

231_Significance of tailwater level in culverts.png

Fig: Tailwater level in culvert


Related Discussions:- Significance of tailwater level in culverts

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Building classification, Why I is the missing after h and J is written in t...

Why I is the missing after h and J is written in the classification of building

Method to calculate the loss of prestress, Method to calculate the loss of ...

Method to calculate the loss of prestress When the consider creep in regard to loss of prestress, we have to see that the prestressed member is under compressive stresses due

What should be the hydrometer reading, A litre of suspension containing 0.5...

A litre of suspension containing 0.5 N of soil with a specific gravity of 2.70 is prepared for a hydrometer test. When no temperature correction is considered necessary, what shoul

Explain the signalized intersections - transportation, Explain the Signaliz...

Explain the Signalized Intersections Cycle length - the time required for one complete sequence of all signal indications Phase - the right-of-way (green), change (yellow),

Building material, what is grillege foundation and where are use

what is grillege foundation and where are use

Calculate the amount put into saving account, Calculate the Amount put into...

Calculate the Amount put into Saving Account If you want to have $60,000 in 10 years, the amount that should be put into a 6.0% (effective annual rate) savings account now is m

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd