Side clearance of pipes in trenches
From the design point of view, it's predominant to minimize the width of pipe trenches due to thebelow reasons:
(i) Higher cost of excavation is related with wider pipe trenches.
(ii) Width of trench affects the loads on installed pipelines in consideration of embankment condition and wide trench condition. For minimum pipe trench width, loads on pipelines can be decreased.
Though sufficient space has to be provided to allow for proper compaction. This is helpful to decrease the reaction at critical locations of pipelines under traffic and fill loads. Furthermore consideration must be given to accommodate temporary works for deep trenches where shoring has to be provided at the time of construction.
Receprocal ranging explainatoin
Question While designing water storage tank , has movement joints be installed? Answer While designing water storage tanks , group joints can be set up in similar w
With a clear sketch indicate the system of protection of line for works of short duration where ‘ Stop dead restriction' need to be observed on a single line section on a BG track.
A rectangular concrete beam is subjected to a factored moment (Mu) of 345 kip*ft. The beam has the following properties: f'c = 5500 psi fy = 60,000 psi h = 39 in
Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was
what are the classification og aggregates?
purpose
Strength: The strength of aggregates is determined from one of the three tests : Aggregate Impact Test In which the aggregates in a mould are subjected to impact caus
what is meant by white topping cement
Total Dynamic Head: (TDH) y-axis plot point related to each x-axis flow rate along the system curve plot. TDH = h a = TSH + h f + v 2 /2g v 2 / 2g usually small
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd