If an excavation is made in a sandy soil, the structure founded near the excavation will be affected and it will cause extra settlement. The settlement due to excavation of the cut will not extend beyond a distance equal to the depth of cut. For example, if the depth of cut is 5m, then the building at a distance of 5 m from the excavation only will effect. This can be minimised by adequately providing the bracings.
When any cut is made in soft clay stratum, the structure loaded at the sides of the cut acts like a surcharge. Therefore the clay near the bottom of the cut yields laterally towards the excavation under this surcharge. Hence, the ground surface above the yielding clay starts settling.
Q. What is Sedimentation tank ? This is a process in which the water is passed through bases or tanks in which the velocity of water is so reduced or water is given a period of
Cleaning and greasing of steel sliding bearings : Following equipments are required for greasing of steel sliding bearings: 1. Jacks (50 ton capacity) - 2 nos. 2. Hard wo
Q. Necessity of air valves in pressurized pipelines? Air valves are broadly categorized into two major types: single air valves and double air valves. Single air valve comprise
how to perform a rectangular tie using optical square?
expressions for calculating corrections for earth curvature
calculating the Bo matrix
Explain the Primary Treatment for Wastewater Primary Treatment: to remove the pollutants that floats or settles. Typically 60% of suspended solids and 35% of BOD 5 are removed
Functions and Desirable Characteristics of Pavements Function of Pavement A pavement is that part of a road on which vehicles travel. The pavement has the following f
Explain the Erosion and Sedimentation Erosion: Removal of soil or other channel material caused by the rapid movement of water over the channel surface. The removed material
A 30 cm diameter pile penetrates a deposit of soft clay 9 m deep and rests on sand. Compute the skin friction resistance. The clay has unit cohesion of 0.6 kg/cm 2 . Suppose
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd