Show the process of waterproofing for bridge decks, Civil Engineering

Assignment Help:

Q. Show the process of Waterproofing for bridge decks?

Waterproofing materials such as membranes are applied on top of bridge deck surface since: 

(i)  Vehicular traffic (for exampletanker) CAN carry dangerous chemicals and leakage of such chemicals in absence of waterproofing materials can endanger the life of bridges. Chemicals easily penetrate and cause the deterioration of concrete bridge decks.

(ii) In a number of countries where very cold weather is frequently encountered, salt can be applied for defrosting purpose. In case waterproofing isn't provided, salt solution penetrates through concrete cracks of bridge and causes corrosion of reinforcement.

(iii)In the event of cracks appearing on concrete deck, water penetrates bridge deck and brings about steel corrosion.


Related Discussions:- Show the process of waterproofing for bridge decks

State the term axial prestressingin - Concrete, State the term Axial Prestr...

State the term Axial Prestressingin Concrete If the centroid of cross-sectional areas of tendons is at the location of the centroid of the cross-section of the concrete member,

Designing of roadbase material, Question In General Specification for C...

Question In General Specification for Civil Engineering Works, designing of roadbase material is based on recipe approach. Give reason. Answer Designing of roadbase

Shear strength of concrete., why do we use effective depth ''d'' in calcula...

why do we use effective depth ''d'' in calculating the shear capacity of uncracked Concrete beam. If it is uncracked, why cant we use the full depth ''D''.

Time to remove formwork to cater for early thermal movement, Q. Time to rem...

Q. Time to remove formwork to cater for early thermal movement? Let's take a circular column as an illustration to explain effect of internal restraint to thick sections.  W

Plane table sureying, discuss the resection method of plane table sureying ...

discuss the resection method of plane table sureying in detail

Find the youngs modulus of the rod, Find the Youngs modulus of the rod: ...

Find the Youngs modulus of the rod: A composite rod is made by joining a copper rod end to end with a second rod of different material but of same cross-section. At 25oC, the

Borrow pits - embankment construction, Borrow Pits Borrow pits are th...

Borrow Pits Borrow pits are the locations from where the embankment soil is obtained. The following guidelines govern the location of borrow pits : (a) They should be pref

Resting on several raking piles, Question Should dolphins be designed i...

Question Should dolphins be designed in a rigid manner such as resting on several raking piles? Answer While designing dolphins, they are normally supported on a syste

Explain interim inspection - underwater inspection of bridge, Explain the I...

Explain the Interim inspection - underwater inspection of bridge An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is us

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd