Q. Show the Overlays on concrete bridge deck?

After years of servicing, some overlays can be applied on the top surface of bridges. Overlays on concrete bridge decks achieve the subsequent purposes: 

(i)  It aims to provide a smooth riding surface. Therefore it can be applied during the maintenance operation to hide uneven and spalling deck surface and provides a smoother surface for road users.

(ii) The use of overlays can extend the life of bridge deck.


Related Discussions:- Show the overlays on concrete bridge deck

What is dead weight, Dead weight Dead loads are the weight of perma...

Dead weight Dead loads are the weight of permanent components of the structures such as the weight of the elements and spheres, casing weight, weight of the false ceiling a

Process of installation of elastomeric bearing, The process of installation...

The process of installation of elastomeric bearing differs in case of precast vis-a-vis cast-in-situ girders. For precast girders, the bearing may be fixed to the underside of the

REport, CASTE DISCRIMANIMATION

CASTE DISCRIMANIMATION

Question, The state of stress at a point is given by the stress components ...

The state of stress at a point is given by the stress components sx = 70 MPa, sy = 10 MPa and ?xy = - 40 MPa. Using Mohr''s circle, find (i) Principal stresses, and (ii) Principal

Theory of structures, haw do you salve a supple supported beam with a sprin...

haw do you salve a supple supported beam with a spring balance

Define the net positive suction head, Define the Net Positive Suction Head ...

Define the Net Positive Suction Head All values in the equations are in units of feet.  Note: Only use values related to the suction side of the pump.   NPSHR = Net Posi

EDTA, how to find total hardness by EDTA

how to find total hardness by EDTA

Determine the term - degree of prestressing, Determine the term - Degree of...

Determine the term - Degree of Prestressing Degree of Prestressing It is a measure of the magnitude of the prestressing force related to the resultant stress occurring in

Calculate the horizontal distance, Calculate the Horizontal Distance A ...

Calculate the Horizontal Distance A surveyor's total station measured slope distance near station 3245+26.35 is recorded as 437.380-m with a zenith angle of 118º 48' 07" and a

Minimum volume of sump volume for pumps, Minimum volume of sump volume for ...

Minimum volume of sump volume for pumps Maximum pumping rate = Q P Volume of sump = V Inflow Rate = Q i Cycle Time T c = t 1 + t 2 t 1 = V / Q P - Q i t 2

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd