Q. Show the Limitations of grillage analysis?
In designing the number of cells for concrete box girder bridges, in case depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width then it is recommended to be designed as a single cell box girder bridge. Though if the bridge depth is smaller than 1/6 of bridge width then a twin-cell or multiple cell is a better.Though one should note that even for wider bridges with small depths, number of cells must be minimized since there isn't much improvement in transverse load distribution when number of cells of box girder is increased to three or more.
For structural analysis of bridges, grillage analysis that involves the structure to be modelled as a series of transverse and longitudinal elements that are interconnected at nodes is normally adopted.
Grillage analysis suffers from the following limitations:
(i) For coarse mesh, torques may not be identical in orthogonal directions. In the same way twists may differ in orthogonal directions.
(ii) Moment in any beams is primarily proportional to its curvature only. Though moment in an element depends on curvatures in the beam's direction and its orthogonal direction.
Grillage analysis can't be used to determine the effect of distortion and warping. Furthermore the effect of shear lag may hardly be assessed by using grillage analysis. By employing fine mesh of elements, local effects may be determined with a grillage. On the other hand, local effects can be assessed separately and put in the results of grillage analysis.
Scenario You are working as a structural technician and have been charged with a range of jobs involving analysis and design of a number of structural members. Task 1 a)
why
Why are undisturbed samples needed? Describe any one procedure of obtaining undisturbed samples for a multi-storeyed building project. For what purpose are geophysical methods u
State the Needs for high strength steel and concrete In prestressed concrete construction, tendons have 3 small area of cross-section compared to the cross-sectional area
M/i=e/r=f/y
Define Chlorides - underwater inspection of bridge? Chlorides do not attack plain concrete when present in the concentrations that normally exist in seawater, but may greatly a
Explain the Shrink Factor of Soil In addition to the swell factor and its associated load factor, soil also has a shrink factor. While the first two relate the volume of an equ
I am a civil engineer and interested to teach.Is there any vacancy?
Define Cleanliness of Surface - Limitations of Ultrasonic System? Sound energy transmission is greatly affected by marine growth on the surface of the concrete element. Ultraso
A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd