Show the functions of wet wells, Civil Engineering

Assignment Help:

Q. Show the Functions of wet wells?

Wetwells are designed to store provisionallysewage/water before it is pumped out. They are generally provided for sewage and stormwater pumping stations and they serve the below functions: 

(i)  They help in attenuating the fluctuations of flow due to the diurnal variation of sewage discharge.

(ii) Wetwells serve as sump pits where suction pipes are inserted and fluid level in sumps can be used for the control of opening and closure of pumps.


Related Discussions:- Show the functions of wet wells

Define the design of piers and abutments erected in water, Define the Desig...

Define the Design of Piers and Abutments Erected in Water? All piers and abutments erected in water are generally designed to be protected from scour or erosion.  However, both

Mensuration, My team has to construct a swimming pool at the back of the ho...

My team has to construct a swimming pool at the back of the house. It’s interior dimensions are 10M x 3M and 1M at the shallow end and 2.5M at the deep end. The walls and the bas

Errors in leveling, what is the errors faced in leveling servey

what is the errors faced in leveling servey

What do you mean by guide bunds, Q. What do you mean by Guide bunds? Gu...

Q. What do you mean by Guide bunds? Guide bund may be given an elliptical shape separation of flow can be avoided better with such an alignment. Alternatively straight parallel

Simply-supported beam, A simply-supported beam (AB) with an overhang (BC) i...

A simply-supported beam (AB) with an overhang (BC) is illustrated in Figure 1(a), with the cross-sectional details given in Figure 1(b). The dead load comprises self weight only; f

Amount of borrow needed to bring area to elevation of 90-ft, Surveyed eleva...

Surveyed elevations are shown in Figure for a 50' x 50' grid at a proposed parking lot location. The amount of borrow needed to bring the area to an elevation of 90-ft is most near

Calculate the square foot of contact area for the formwork, A concrete crew...

A concrete crew will use the available steel form panels measuring 2'-6" wide x 4'-0" high to construct a 40'-6" long by 3'-2" high by 1'-6" wide concrete knee wall. The square

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd