Wetwells are designed to store provisionallysewage/water before it is pumped out. They are generally provided for sewage and stormwater pumping stations and they serve the below functions: 

(i)  They help in attenuating the fluctuations of flow due to the diurnal variation of sewage discharge.

(ii) Wetwells serve as sump pits where suction pipes are inserted and fluid level in sumps can be used for the control of opening and closure of pumps.


Related Discussions:- Show the functions of wet wells

Rainfall-runoff computation, hi sir. i hope every thing is fine with you. I...

hi sir. i hope every thing is fine with you. I want to have an information about the way how to compute stream flow from the rainfall over the catchment and anso need the way how t

How to determine the frequency of flood, Q. How to determine the frequency ...

Q. How to determine the frequency of flood? Flood frequency may be estimated preferably from flood records, if available, for a number of years or they may be based on rainfall

Construction - concrete pavement, Construction: Construction is usual...

Construction: Construction is usually done by one of the three methods: (a) Manual method, providing steel or wooden forms, pouring concrete and compacting by means of nee

Define the process of eccentric prestressing, Define the proess of Eccentri...

Define the proess of Eccentric Prestressing In this form of prestressing, the centroid of cross-sectional areas of tendons is not located at the centroid of the cross-section.

Do you mean by accelerated aging, Q. Do you mean by Accelerated Aging? ...

Q. Do you mean by Accelerated Aging? Accelerated ageing tests are conducted at elevated temperature of 100 o C to know the variation in hardness, UTS and elongation at break.

Calculate the resultant hydrostatic force, Five 1m diameter, 2m high cylind...

Five 1m diameter, 2m high cylindrical drums filled with earth are placed upright and side-by-side in a straight line across a 5m wide creek to form a simple dam completely blocking

Calculate the total board feet, A project engineer has ordered 100 hardwood...

A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long.  The total board feet ordered is most nearly:  Solution: 1.25" x 8" x 8' x 100

Principle of adding cooling pipes, Question What is key principle of a...

Question What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation? Answer These methods aim at reducing placing tem

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd