Q. Show the Functions of wet wells?
Wetwells are designed to store provisionallysewage/water before it is pumped out. They are generally provided for sewage and stormwater pumping stations and they serve the below functions:
(i) They help in attenuating the fluctuations of flow due to the diurnal variation of sewage discharge.
(ii) Wetwells serve as sump pits where suction pipes are inserted and fluid level in sumps can be used for the control of opening and closure of pumps.
Q. Bitumen emulsions - difference between anionic emulsions and cationic emulsions? Bitumen emulsions comprises particles of bitumen dispersed in water by using emulsifying age
Cost-volume relationship: Cost-volume relationship is illustrated through a simple example dealing with the cost of operating an automobile. To perform the analysis following
Question What is main principle of post-grouting for mini-piles? Answer During course of post-grouting , a tube with a hole at its base is lowered into pile and g
Define Types of Inspection of Bridge? Underwater inspections are generally categorised into five types: - Inventory - Routine - Damage - In-depth - Interim
AFor the given reinforced concrete moment frame school building determine; 1. The wind load acting on the middle truss in the roof truss assembly. 2. The net wind pressure (Wnet) o
Magnitude of torque - bending moment: A prismatic bar of hollow circular cross-section along with outer and inner diameters 100 mm and 80 mm correspondingly, carries a bending
Question Should reversible moisture movement be taken into account in estimating movement for movement joints ? Answer Size of concrete is affected by changes in dist
can you give me some examples and problems in 3-wire leveling?
Extreme fiber stresses at the mid span section of the beam A pre-stressed concrete beam, of cross section 300 mm x 500 mm and 8 m span, is pre-stressed with a parabolic tend
Q. What are the causes of settlement? The various causes of settlement are: 1) increasing load on the surrounding soil deposit, 2) excavation, 3) lowering of water tab
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd