Show the functions of hydraulic jump, Civil Engineering

Assignment Help:

Q. Show the Functions of hydraulic jump?

The usage of hydraulic jump in hydraulic engineering isn't uncommon and creation of such jumps has numerous purposes: 

(i)  Its major aim is to perform as an energy-dissipating device to decrease the excess energy of water flows.

(ii) The jump produces significant disturbances in the form of eddies and reverse flow rollers to facilitate mixing of chemicals.

(iii)At the time of the jump formation, significant amount of air is entrained so that it helps in the aeration of streams that is polluted by bio-degradable wastes.

(iv) Itallows efficient operation of flow measuring device such as flumes.


Related Discussions:- Show the functions of hydraulic jump

Explain the suppressed rectangular weir, Explain the Suppressed Rectangular...

Explain the Suppressed Rectangular Weir If the length of the weir (b) equals the width of the channel, i.e., the flow is not "contracted".

Pumping for concreting works, Question What are the key problems if use pu...

Question What are the key problems if use pumping for concreting works ? Answer In pumping operation , force exerted by pumps have to overcome friction involving concrete an

Determine the dimension of the vertical side walls, Determine the dimension...

Determine the dimension of the vertical side walls for a rectangular open channel designed to convey 150 cfs of storm water runoff. The runoff is collected in the parking lots and

Construction water, what should we do if alkalinity in water is greater tha...

what should we do if alkalinity in water is greater than 25

Water tretement, define scale and sludge and mention the scale and sludge f...

define scale and sludge and mention the scale and sludge forming substance and explain the prevention methods

Pre-stressing work, Under which situation shall engineers use jacking in ag...

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Premix, how we can do good premix

how we can do good premix

Evaluate the length of guide bund, Q. Evaluate the Length of guide bund? ...

Q. Evaluate the Length of guide bund? For encouraging axial flow through the bridge, upstream length of guide bund may be kept 1.0 to 1.5 times the bridge length and downstream

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd