A filter placed between the revetment / protection works at the surface and the soil bed below the revetment / protection works. Main function of a filter below revetment is to allow the ground water to pass through the filter layer but arrest the movement of soil particles of the bed material. Hydraulic conditions of the river, characteristics of bed / bank material, etc are studied before deciding the properties of filter. Some of the important variables can be listed as, location of filter i.e. whether on slope or on bed, hydraulic gradient through the filter and its direction, characteristic properties of sub-soil, water permeability of sub-soil and soil tightness, suspended sediment load in the flow and its characteristics, etc.


Related Discussions:- Show the filter below the revetment

Building technology 1, what are the defects in timber due to natural forces...

what are the defects in timber due to natural forces?

Survey, Operation in chain surveying

Operation in chain surveying

What is rail lubricators, Q. What is Rail Lubricators? 1. P & M type of...

Q. What is Rail Lubricators? 1. P & M type of lubricators - These lubricators can be used for lubrication of FF rails as well as BH rails. 2. Elgi grease pump - Elgi Bucket

Joints in concrete pavements, Joints in Concrete Pavements: Concrete ...

Joints in Concrete Pavements: Concrete pavements in India are of the jointed plain (unreinforced type). The following types of joints are needed in them : (a) Transverse C

Evlaute width and depth for stable alluvial canals, Q. Evlaute width and de...

Q. Evlaute width and depth for stable alluvial canals? Lacey originally evolved width and depth formulae for stable alluvial canals. These were the following.  P = 4.836 Q 1

Convert the azimuth reading of 273.34 to a land bearing, Convert the azimut...

Convert the azimuth reading of 273.34º to a land bearing:  Solution: Convert 273.34º to degrees minutes and seconds = 273º 20' 24" Next, convert the angle to orient to IV

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd