Show the direction of gunning in shotcreting, Civil Engineering

Assignment Help:

Q. Show the Direction of gunning in shotcreting?

At the time of the construction of shotcrete, it is intended at gunning the full thickness in one single operation and this helps to decrease the occurrence of possible delamination and formation of planes of weakness. Furthermore nozzles must be held about 0.6m to 1.8m from the surface and normal to the receiving surface. Reason of gunning perpendicular to receiving surface is to avoid the possible rebound and rolling resulting from gunning at an angle deviated from the perpendicular. Rolled shotcrete creates a non-uniform surface that serves to trap overspray and shotcrete resulting from the rebounding action. This is undesirable due to the wastage of materials and generation of rough and uneven surface.


Related Discussions:- Show the direction of gunning in shotcreting

Functions of bedding below storm water drains, Question What are main funct...

Question What are main functions of bedding below storm water drains ? Answer Bedding that is normally made of granular resources or concrete serves four main functions as optio

Chemical analysis of fe 415., in this chemical analysis what is the meaning...

in this chemical analysis what is the meaning of c% and s% and P%

Shear lag in typical box-girder bridge, Shear lag in typical box-girder bri...

Shear lag in typical box-girder bridge For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flang

Equivalent static load earthquake force analysis method, Equivalent static ...

Equivalent static load method After the earthquake in Messina-Reggio Italy 1908, a team composed of engineers were sent on duty to study deteriorated buildings and investigate

Timer, grading classification

grading classification

Construction Planning, A contractor has both a 3-cy and a 5-cy shovel in th...

A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day

Statics, Currently I am struggling with masteringengineering.com So is it f...

Currently I am struggling with masteringengineering.com So is it fine to give you my username and password so you could solve my problems. please show your work.

Scales and sludges, Discussscales and sludges. Writea note on internal trea...

Discussscales and sludges. Writea note on internal treatment of water

State the problem and phases of site investigation, State the Problem and p...

State the Problem and phases of site investigation The site investigation is to be performed to obtain the solution for the following problems: i)  Foundation problems ii

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd