Q. Relation of pouring rate and temperature with concrete pressure on formwork
Freshly placed concrete exerts pressure on formwork at the time of the placing operation. It's influenced by the rate of placing and air temperature. For illustration if concrete pouring rate is too slow, setting of concrete starts to occur. Consequently concrete at the bottom of formwork sets prior to the placing of fresh concrete at the top and maximum pressure will be decreased.
Temperature affects the rate of hydration of concrete. The higher the air temperature is, the higher would be the rate of hydration reaction. Therefore fresh concrete leads to set at a faster rate. Pressure exerted on formwork reduces with an increase in temperature. Therefore formwork is subjected to a higher pressure exerted by fresh concrete in winter than in summer.
Fig: Diagram of design concrete pressure diagram on formwork
Q. Vibration in structures - resilient bearings? When railway tunnels are built close to buildings, ground-borne vibration is transmitted to buildingsthrough compression and sh
What is sag rod..?
an increase in consumer income will affect the supply of any given product
industrial applications of ultrasonic welding,soldering,drilling,claning
Q. Do you mean by Accelerated Aging? Accelerated ageing tests are conducted at elevated temperature of 100 o C to know the variation in hardness, UTS and elongation at break.
Aplease provide tables for each design mix and also the, high early strengh.l thanks
why A.C. Sheets are given curved shape
What quantity of cement will be needed to lay 2000 blocks of 9 inches using a mortar ratio of 1:6 with a thickness of 25mm in-between blocks.
Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of sever
Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd