Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
Application of cad
The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535
01-- what is the scope of som? 02-- how can we learn and understand shear force and bending moment diagram?
parameters specified in a steam boiler
moment and axial force relation proof
deff. b/w asa and ors
Flash Butt Welding-Flashing The phenomenon of flashing is of extreme importance in achieving satisfactory welds. Flashing can begin only after a molten bridge has been formed s
Permanent Way: Definition In railway engineering, the permanent way refers to the earthen formation and the track structure over it. Gauge The separation
Before I submit my papers, I need to have something in writing regarding confidentiality of my work. Please advise. Bill Bridges
Two concentric perforared plates are seperated by a 200mm launder and form the flow exit for a clarifier (figure 1). The inlet water flow of 1200 mcubed/hour into the clarifier is
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd