Q. Show the Coating Application?
Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
Q. Design Storage compounds for bulk solids? Storage compounds for bulk solids, liquids and liquefied gases are normally included in a plant layout to provide short term storag
Battery Inspection : A fully charged and properly maintained battery is essential for proper lighting and starting of the motorcycle. STEPS Remove the right side cov
Stitch welding Here, a series of overlapping spot welds are made with the spot welding machine using the conventional electrode tip. Both water tight and gas tight joints can b
Compute the force in the rod: A rod ABC rotating at 20 rpm about a vertical axis through A, supports a ball of mass 10 kg at its lower end. It is fixed in position by the rod
actual division 2km is shown as 1 cm in a map.construct a clean scale to measure km which can travel a distance upto 30 km.Show measurement of 18 km in the scale
how it is use to determine the wavelenth of He-Ne laser?
applications of engineering statics
The Mechanical Engineer/Specialist shall be responsible for specifying Vendor Drawings and Data Requirements in the MRQ and MRP using the WorleyParsons standard vendor drawing and
Crank Pin and Crank Shaft - Part of combustion engine: Cran k Pin: Crank pin is region on crank shaft on which big end of connecting rod is attached. These pins are eccentr
Case study entitled " Exxon Valdez Oil Spill Disaster ". 1. Examine the aim and objectives of Exxon Mobil Corporation. 2. Carefully observe the oil and refinery ind
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd