Show the coating application, Mechanical Engineering

Assignment Help:

Q. Show the Coating Application?

Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.

Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.

The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.

In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.


Related Discussions:- Show the coating application

Due diligent, Due Diligent:   There are many literatures on sand blast...

Due Diligent:   There are many literatures on sand blasting and manufacturing processes. Historically, sand blasting had been used for many tasks before. It was pretty famous

Explain the information phase of radial drilling machine, Information Phase...

Information Phase: Step: To secure all and complete information and gather facts and from best sources.   Our project is selected based on the current problem face by the

Cantilever beam - shear force diagrams, Cantilever beam - shear force diagr...

Cantilever beam - shear force diagrams: Illustrate the shear force & bending moment diagrams for the cantilever beam illustrated in Figure. Figure Solution

Generation of continuation, Generation of Continuation It is assumed th...

Generation of Continuation It is assumed that a partial schedule (which may be empty schedule) is given. For this partial schedule, a number of possible continuations is genera

Evaluate the total deformation of the bar, (a) A member ABC is formed by co...

(a) A member ABC is formed by connecting a steel bar of 20mm diameter to an aluminium bar of 30 mm diameter, and is subjected to forces as shown in figure. Evaluate the total defor

Determine the centroid of the truss gusset plate, Determine the centroid of...

Determine the centroid of the truss Gusset Plate shown in figure below.

Jet pump, full detail of jet pump nozzle design

full detail of jet pump nozzle design

Calculate the heat supplied from the outer surface, Consider laminar flow i...

Consider laminar flow in a circular tubewith a fully developed velocity profile.Let the heat be added at a constant rate along the tube from  x+ =0  to  x+ =0.10 . Thereafter ,let

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd