Q. Show the Coating Application?
Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
Capacitor Discharge Welding This is used for welding of studs, welding of thermocouples, etc. on the base metal. A low voltage, high amperage electrical discharge from a capac
Plate clutch movement on center clutch : Place plate clutch on centre clutch as shown in the picture and move the plate clutch up and down, while moving the plate clutch in the ce
Upward Compatibilityof IGES Upward Compatibility : The need for generations of processors to parse files compliant with earlier versions of IGES thwarted the breadth and rate o
Q: The12m boom AB weight 1 KN, the distance of center of gravity G is 6 m from point A. For the position given, determine the tension T in cable and reaction at B.
What is load? Sol. : A load can be defined as the combined effect of external forces acting on the body. The load is applied on body whereas stress is induced in material of
Q. Module Assembly Site Preparation? To set a module on the piles installed on project site, the following preparations shall be made: The Designer shall provide design elev
Q. Show Piping Material Specifications? Piping Material Specifications include the development and / or review of material specifications, and the review of data sheets, materi
Calculation of Material Removal Rate MRR = (W i - W f ) × 1000/ 7.8 × T .......................................... (1) W i = Initial weight of work piece W f = Final w
Load shared by concentric springs: Two concentric springs are subjected to an axial load of 60 kN. The maximum permissible deflection of the springs is 45 mm & the solid lengt
have assignment in FEM calculation and ANSYS are you able to solve this kind of assignment
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd