Show the coating application, Mechanical Engineering

Assignment Help:

Q. Show the Coating Application?

Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.

Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.

The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.

In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.


Related Discussions:- Show the coating application

Selection of metallic materials, Q. Selection of metallic materials? Th...

Q. Selection of metallic materials? This Engineering Practice has been written to assist those involved in the construction of new equipment and for the maintenance of existing

Calculate the induction motor efficiency, Question: Characterisation te...

Question: Characterisation tests have been performed on a four pole, 415 V (line to line), three phase, star connected, 50Hz induction motor, with the following results:

MRP 1, Advantages and disadvantages

Advantages and disadvantages

Subcontractor submittals, The Supplier/Subcontractor shall submit, for acce...

The Supplier/Subcontractor shall submit, for acceptance, their Material Traceability and PMI program and procedures, which shall comply with this specification, prior to the sourci

Steam, what is dry ness fraction?

what is dry ness fraction?

Wire-frame entities-representing ellipse and parabolas, wire-frame entities...

wire-frame entities-representing ellipse and parabolas

Design requirements, A steel member supported by a tie bar has a load of 15...

A steel member supported by a tie bar has a load of 15 000 lbs on it. If the force on the steel member of 1.2 in 2 cross section is 14,180 lbs and the force on the tie bar of diam

Methods of analysis of trusses, Methods of analysis of trusses: What ...

Methods of analysis of trusses: What are the methods of analysis of trusses? What is found when the analysis of a system is done? Sol.:  The forces in the members of

#tTORQUE, HOW TO CALCULATE OUTPUT TORQUE OF HELICAL GEAR BOX

HOW TO CALCULATE OUTPUT TORQUE OF HELICAL GEAR BOX

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd