Q. Show the Coating Application?
Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
Draw the P-h and T-S diagram for the vapour compression cycle when the vapour after compression is : (i) wet region (ii) dry saturated
Consider a trapezoidal channel with a bottom width of 4 m, side slopes of 3:1 (H:V), and a bottom slope of 0.002 that carries 50 cms. The channel has a Manning's roughness of 0.034
how can I represent spring force direction
Evaluate the point of contraflexure: An overhanging beam of 15 m span is carrying a consistently distributed load of 1 kN/m over the length of 10 m at a distance 5 m from the
define prandtl''s stress function
Corollaries of first law of thermodynamics: First law of thermodynamics has significant corollaries. Cor ollary 1: (First Law for process). There exists property of
Choose a wire rope for a vertical mine hoist to lift a load of 55 kN from a depth of 300 metres. A rope speed of 500 metres/min is to be attained in 10 seconds.
Brazing Brazing is a group of welding processes, which produces, coalescence of materials by heating them to a specific temperature and by using a filler metal having a liquids a
MANDATORY CHECKS DURING THE FIRST SIX SERVICES Various steps in servicing of motorcycle are given below in a tabular form. 2.3.1 First Service and Second Ser
Determine hardness of material: Hardness is surface property. It can be defined as resistance of material against permanent deformation of surface in the form of scratch, inde
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd