Show the coating application, Mechanical Engineering

Assignment Help:

Q. Show the Coating Application?

Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.

Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.

The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.

In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.


Related Discussions:- Show the coating application

OPITZ alternative, I am looking for an alternative coding system to the OP...

I am looking for an alternative coding system to the OPITZ coding system for my essay thanks

Find an approximated probability, Find an approximated probability: Si...

Find an approximated probability: Sixteen numbers are selected independently and at random from the interval [ 0, 1 ]. Find an approximated probability that the mean of these

Design for a water treatment plant, Design for a water treatment plant: ...

Design for a water treatment plant: Produce as individuals a single tab Excel spreadsheet which shows a rough initial design for a water treatment plant taking 15

What are wall footings, What are wall footings? Explain in short. Gener...

What are wall footings? Explain in short. Generally wall footings are required to support direct concentric loads. However, an exception is the wall footings for retaining wall

Stroke and clearance volume - thermodynamics, Stroke and Clearance Volume: ...

Stroke and Clearance Volume: Stroke The distance traveled by piston from the topmost positions of it (also called Top dead centre TDC ), to its bottom most position (or

Carbon and low alloy steels for welding, Q. Carbon and Low Alloy Steels for...

Q. Carbon and Low Alloy Steels for Welding? All welding of pressure retaining equipment must be completed as per the respective code, typically ANSI/ASME B31.1 or Section VIII

Thermal, mean effective pressure of dual cycle

mean effective pressure of dual cycle

Piping material specifications, Q. Show Piping Material Specifications? ...

Q. Show Piping Material Specifications? Piping Material Specifications include the development and / or review of material specifications, and the review of data sheets, materi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd