Q. Show the Coating Application?
Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
refrigeratorequipments
Explain the autoignition and detonation theory of detonation. What do you mean by preignition ? Describe octane Rating of a fuel. What are the different S.I. engine combustion cham
Q. Explain about Post-weld Heat Treatment? Post-weld Heat Treatment (PWHT) shall be in accordance with the Code. PWHT procedures, including properly identified charts or certi
Design varies with scale of operation The design of a fermenter varies with scale of operation from lab (1-20L), to pilot (up to 5000L) to production (to >200,000L) scales. Th
Cylinder Series Test A series of round bars of various diameters are austenitized and quenched into oil or water. The bars are long sufficient hence the cooling of section at
Degre e of Super Heat: It is difference between the temperature of superheated steam and saturation temperature resultant to the given pressure. So, the degree of superhea
Do not round intermediate calculations; however for display purposes report intermediate steps rounded to four significant figures. Give your final answer(s) to three significant f
Corporate level - Safety Organization This is a corporate level and there should be a company director which is engaged in formulating safety policies at corporate level. The
Change in entropy for reversible
Q. Stacking in the Applicators storage? Stacking in the Applicator's storage yard shall be in accordance with good safety practices and/or OWNER Specifications. Sufficient spac
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd