Q. Show the Coating Application?
Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
stability
The mass flow rate is 28kg/s in an axial flow gas turbine that develops 3.5MW. The stagnation conditions are 780KPa and 730 deg.C. at the entry. At the exit of the nozzle, the stat
Advantages and disadvantages of solid fuels
Explain the Effect of Cutting Speed Increase in cutting speed improves the surface finish due to the continuous reduction in built up edge. The curve a represents the machining
have assignment in FEM calculation and ANSYS are you able to solve this kind of assignment
The rotor of a turbo charged having mass of 10 Kg is keyed to the centre of 25 mm diameter of steel shaft of 400 mm between bearings. Calculate : (i) Critical speed of shaft.
These parts of joints are used to connect two rods, which are under compressive or tensile stress. The ends of the rods are in the manner of a socket and shaft that fit together an
Calculate the angular deflection (in degrees) produced in a solid circular shaft of diameter 12.5mm and length 0.5 m when the shear stress is 25MPa and the shear modulus 70GPa. Wha
a) Describe and illustrate the terms with their classification: Mechanism, Kinematic, Machine links and Kinematic pair. b) Discuss the Inversions of double slider crank chain an
Q. Show the types of Changes in project? During the development and execution of a project, the following changes can occur: Scope of work changes Cost deviation
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd