Q. Show the Coating Application?
Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application temperature recommended by the manufacturer, but not to exceed 525°F (275°C). Any pipe exceeding 525°F (275°C? shall become the property of the Applicator, and Applicator shall reimburse the OWNER for its total value.
Pipe shall be coated as soon as possible, within a maximum of 4 h of surface preparation. Oxidation of the pipe surface prior to coating, in the form of "blueing" or other apparent formation is not acceptable. If such oxidation occurs, the pipe shall be cooled to the ambient temperature and recleaned at no expense to OWNER.
The powdered epoxy shall be applied to the pipe surface by the electrostatic spray method at a sufficient rate to provide a uniform cured film thickness. Unless otherwise directed by the purchase order the applied film shall be a nominal 20 mil (0.51 mm) average thickness with 18 mil (0.46 mm) minimum thickness and a maximum thickness of 24 mil (0.61 mm). Pipe so rejected by the Company shall be stripped and recoated at no extra cost to OWNER. The coating shall be applied over the full length of pipe to within a maximum of 6" (152 mm) and a minimum of 2" (51 mm) from the ends of the pipe.
In the event that the specified coating thickness is inadequate to obtain less than the maximum allowable holidays per joint of pipe, the Applicator and OWNER shall evaluate the cause for the excessive holidays and determine if the thickness as specified should be altered.
what is diflection of beam
design the bucket elevator
Q. Analog Control System for steam generator ? The analog (modulating) control of the Steam Generators will be performed using a Process Control System (by Buyer). Detailed fun
three vertical, parallel straight rods, each 2.6m in length have their upper ends firmly secured and their lower supporting a rigid horizontal bar with a weight of 8KN, which cause
General Phase of Radial Drilling Machine Steps- 1. Prepare a strong foundation for the value study. In radial drilling machine hole can not be produce in any angle.
design considerations
b. Assuming a 20 MW simple cycle gas turbine with a firing temperature of 1600K develop an analysis of a combined cycle. Assume that Tmax in the Rankine cycle is 560 C, Pmax = 60
Definition of screw conveyor Screw conveyors belong to the conveyer with traction component. It depends on the shaft with spiral blades in hematic chute to make material move o
For the beam shown below, we need to determine: (i) the support reactions R L and R R (ii) the shear force and bending moment diagrams (iii) the maximum stress in the b
Explain in detail about the Pile Foundations Where the support given by top soil is not sufficient and the load has to be carried deep down for purposes of stability and contro
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd